PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
Política
CONGA: HUMALA BRINDARÁ TODA LA AYUDA A FACILITADORES
13/07/2012

Rockhopper ve resultados "enormemente alentadores" en pozo de Malvinas

Ámbito Financiero

La Petrolera británica Rockhopper Exploration reportó unos resultados "enormemente alentadores" en un pozo de petróleo de las Islas Malvinas y dijo que realizará nuevas pruebas el próximo mes para tratar de establecer su viabilidad comercial.

"El pozo ha sido altamente exitoso, mostrando un reservorio muy espeso, de alta calidad, y una columna de petróleo sustancial", dijo la compañía británica en un comunicado.

Rockhopper es una de varias exploradoras de crudo que perforan en las aguas de las Malvinas. Pero las pruebas de petróleo hasta ahora no han mostrado efectivamente si existen cantidades suficientes de crudo viable como para justificar inversiones en infraestructura.

Rockhopper dijo que sus pruebas habían encontrado un reservorio significativo y una columna de hidrocarburos. "Este es un resultado enormemente alentador", dijo el presidente ejecutivo de la empresa, Sam Moody.

"La prueba del pozo será otro paso clave en el camino para demostrar el carácter comercial del descubrimiento Sea Lion", agregó.

La compañía dijo que se haría un nuevo anuncio una vez que se haya completado la próxima ronda de pruebas, dentro de alrededor de un mes.

Las acciones de otra exploradora de las Malvinas, Desire Petroleum , escalaron después de que la firma completó pruebas sísmicas que según dijo resaltaron nuevas perspectivas de perforación costas afuera.

Los inversores han enfrentado fuertes altibajos en los últimos dos años por los problemas y éxitos de la exploración en las Malvinas.

Comunicado

Rockhopper
Rockhopper Exploration, the North Falkland Basin oil and gas exploration company, is pleased to provide the following update on the 14/10-5 appraisal well:

• Significant reservoir package and hydrocarbon column encountered • Wireline log analysis indicates 93.5m (306 feet) net pay in good quality reservoir • Average porosity greater than 20% • Average permeability of 100-200 millidarcies (mD) and up to 1,000mD • 79m net pay in main fan complex • 14.5m net pay in lower fan complex • No oil water contact observed • Rockhopper now intends to test the well

14/10-5 was drilled 600m north of the 14/10-2 discovery well to a total depth of 2,726m (drilled depth) and was the second appraisal well on the Sea Lion feature.

The well was designed to appraise the Sea Lion main fan reservoir and investigate hydrocarbon column and reservoir distribution. The well has been highly successful, proving a very thick, high quality reservoir package and a substantial oil column. The geological prognosis once again came in very close to prediction.

The Sea Lion reservoir sands were encountered 22m updip from the 14/10-2 discovery well at a depth of 2,378m (drilled depth). A total reservoir package of 110m (360 feet) comprising one main sand and three thinner sands was encountered with a net to gross of 91% in the main sand and 25-80% in the lower sands. The gross oil column in the main Sea Lion fan is now 125m (410 feet). MDT pressures confirm oil gradients throughout all sands. Wireline logging indicates that reservoir quality is good, with average porosity of greater than 20% and average permeabilities of 100-200mD.

79m (259 feet) of net pay has been encountered in the main fan complex with a net to gross of 91%. 14.5m (47 feet) of pay has been encountered in the lower fan complex with a net to gross of 25-80%. The lower fan was not prognosed to be well developed at this location.

64m (210ft) of conventional core was cut and recovered through the main sand. The Company now intends to test the well. Tests will comprise both mini DST (downhole dual packer MDT) and a fully engineered drill stem test (DST). The Company intends to perform mini DST tests on both the upper and lower fans and to perform the fully engineered DST on the upper fan only. Testing operations are anticipated to take approximately a month and a further announcement will be issued once all testing operations have been completed. Following completion of all testing operations, Rockhopper intends to drill a further appraisal well on Sea Lion located some 4.2km to the west of the 14/10-2 discovery well. This well will be located outside the Company’s “low case” area and within the Company’s “mid case” area for the main fan and is also intended to penetrate the lower fan in what the Company believes will prove a more optimal location.

Sam Moody, Chief Executive, commented:

“This is an enormously encouraging result and is a testament to the quality of our technical team. The well test will be another key step on the road towards proving commerciality for the Sea Lion discovery.”

Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF