PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
PEREGRINE METALS: NEW DISCOVERED NEAR SURFACE COPPER MINERALIZATION AT ALTAR
12/04/2011

EL PRESS RELEASE

Newly Discovered Near Surface Copper Mineralization at Altar Extends Deposit 300 Metres Southeast; Bottom 16 Metres of Hole Returned 0.728 Percent Copper and 0.224 Grams/Tonne Gold

Peregrine Metals Ltd. is pleased to report new assay results from angle drill hole ALD-148 completed last month at the large Altar porphyry copper-gold deposit ("Altar") in San Juan Province, Argentina. ALD-148 was drilled 300 metres to the southeast of the previously drilled ALD-37, which at that time marked the easternmost extent of drilling at Altar. The sulphides in hole ALD-148 begin at 18 metres, and copper and gold  mineralization show an increasing trend with depth, ending in 0.728% Cu and 0.224 g/t in the bottom 16 metres of the 450 metre angled hole, reinforcing the depth potential of this project.

Highlights of ALD-148 include:

1. This mineralization occurs outside the eastern extents of prior resource drilling at the transition between the porphyry Cu system and the overlying epithermal Au system that is exposed on the ridge tops to the east of Altar's East Zone.

2. A new hydrothermal breccia was encountered that is very intensely developed below about 200 metres. This could be a separate mineralizing event heretofore unobserved at Altar hosted within the southeast quadrant of the Altar alteration system and induced polarization ("IP") anomaly. This sector of the deposit has not been delineated by drilling and remains open to resource expansion.

3. Sulphides start at 18 metres depth in the hole, potentially positively affecting the stripping ratio at Altar.

4. The Cu and Au grades, the abundance of bornite, the intensity of hydrothermal brecciation, and the intensity of alteration all increase with depth in the hole, suggesting that the copper and gold mineralization may continue to depth. The Company plans to extend this hole during the fourth quarter as part of a comprehensive deep-drilling programme that will be the subject of a future release.

Mr. Jeff Toohey, Peregrine Metals' Vice President, Exploration, said "With this hole we believe we have drilled into a new mineralizing event at Altar, and this is a significant discovery. Not only has hole ALD-148 extended the known mineralization of Altar another 300 metres to the southeast, significantly increasing the potential size of the deposit, but the mineralization begins near surface, which could positively affect the pre-stripping assumptions in the current mine model. Also, the mineralization strengthens at depth, with the bottom 16 metres of the drill hole grading 0.728% Cu and 0.224 grams/tonne gold, highlighting the depth potential at Altar which we will begin to further investigate later this year."

ALTAR BACKGROUND INFORMATION

Altar is a large Andean-style porphyry copper-gold deposit. The alteration zone encompasses an area measuring over three by two kilometres with a strong, coincident IP geophysical anomaly of approximately the same size. A total of 149 core holes has been drilled at Altar for 58,596 metres. The Company is currently conducting a preliminary economic assessment of the Altar project, with completion expected during the third quarter of 2011.

All of the Altar drill core was sampled in continuous two-metre intervals, with half of the core submitted for assay and the other half archived in the Company's secure storage facility. Drill core samples were prepared and assayed by Acme Analytical Laboratories, at their facilities in Mendoza, Argentina and Santiago, Chile as well as by Alex Stewart (Assayers) Argentina S.A., located in Mendoza, Argentina. Copper values are determined by multi-element Induced Coupled Plasma and Atomic Absorption methods.

Peregrine has a comprehensive and rigorous quality assurance/quality control ("QA/QC") programme in place that employs certified assay standards, blanks and core duplicates, as well as routine check assays at a separate secondary laboratory. The QA/QC programme also extends to the metallurgical test-work.

Peregrine holds a 100% interest in the Altar project subject to a 1% NSR royalty granted to Rio Tinto and another 1% NSR royalty granted to the underlying concession owner that may be purchased by the Company at any time for US $1 million.

Mr. Jeff Toohey, M.Sc., P.Eng., Vice President, Exploration for the Company, is a Qualified Person as defined by NI 43-101 and is responsible for the design and implementation of the exploration work being carried out by the Company at the Altar Project. Mr. Toohey has reviewed this press release and approves of its content.


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF