PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
EXTORRE ANNOUNCES A SILVER-GOLD DISCOVERY AT ITS PUNTUDO PROJECT
14/06/2011

Extorre Announces A Silver-Gold Discovery At Its Puntudo Project In Western Santa Cruz Province, Argentina

Extorre Gold Mines Limited reports the discovery of significant silver-gold mineralization at its 100% owned Puntudo project, located immediately south of the Joaquin silver project owned by Coeur d’Alene Mines and Mirasol Resources, and 200 kilometres west of Cerro Moro. Extorre has completed thirty two drill holes to date, with assays in hand for the first fifteen holes. Mineralization has been intersected in drill holes that test the potential strike extension to the south, onto Extorre property, of both the La Negra and La Morocha veins of the Joaquin project.

Highlights from the drilling include:

RD0001 on the La Morocha structure intersected 42.3 metres (“m”) (138.8 feet (“ft”)) at 16 grams per tonne (“g/t”) silver + 0.60 g/t gold (46 g/t silver equivalent*), including 6.9 m (22.6 ft) at 32 g/t silver + 1.01 g/t gold (83 g/t silver equivalent*).

RD0004 on the La Negra structure intersected 3.0 m (9.8 ft) at 695 g/t silver + 0.66 g/t gold (728 g/t silver equivalent*).

RD0015, also on the La Negra structure, intersected 9.0 m (29.5 ft) at 211 g/t silver + 1.19 g/t gold (271 g/t silver equivalent*), including 5.71 m (18.7 ft) at 320 g/t silver + 1.82 g/t gold (411 g/t silver equivalent*).
The discovery site, termed the Renaldo Prospect, is located in the northeast quadrant of the Company’s 29,500 hectare Puntudo project. The adjacent Joaquin project has a NI43-101 compliant resource** of 19.6 million ounces of silver in the Indicated category, and 47.9 million ounces of silver in the Inferred category. This resource is derived from the La Negra and La Morocha veins which have been drilled as far south as Extorre’s Renaldo Prospect’s northern boundary.

With the onset of the southern winter, the two Puntudo drilling rigs and supervising teams will now be relocated to Cerro Moro, where drilling can continue year round, to supplement the four rigs operating there. We anticipate five rigs to be testing the new high grade Zoe discovery and the sixth on regional drilling at Cerro Moro from mid-June.

Click to see a figure showing a plan view of drilling at the Renaldo discovery and its relationship to the adjacent Coeur–Mirasol Joaquin project.

Drill targeting on Extorre’s Renaldo Prospect at Puntudo was based on extrapolating along strike from the La Negra and La Morocha veins at Joaquin in conjunction with in-house ground magnetic data. The resultant magnetic imagery shows a southwest striking linear magnetic low approximately 100 m (328 ft) wide and +1,000 m (3,280 ft) long extending to the southeast following the La Negra trend. The extension to the La Morocha trend is observed as a magnetic discontinuity extending +1,500 m (4,920 ft) into the Extorre property. Additional targets in the Renaldo area, including the intersection of the La Morocha and La Negra structural trends have been identified.
Glen van Kerkvoort, Extorre’s Chief Geologist commented “There is a saying in the mining business that the best place to find mineralization is alongside a known deposit. That has certainly been the case for our Renaldo Prospect. Boosted by the success of the Couer d’Alene and Mirasol discovery to the north we were able to fast track the discovery process at Renaldo. We are encouraged by the fact that Coeur d’Alene has notified Mirasol of its intention to proceed with a Bankable Feasibility Study on Joaquin project.

“The main focus of drilling to date has been the south-eastern extension of the La Negra structure in an area obscured by sand and gravel cover. However, approximately half of the total resource for the Joaquin project to the north is derived from the La Morocha structure and, with the encouraging result in our drill hole RD0001 we have initiated testing of that trend.

“Geologically we interpret the Renaldo discovery to be a silver dominant, high level, low sulfidation epithermal vein system. Wider intercepts of lower grade silver mineralization appear to correlate with oxidized material, similar to the geological descriptions provided for the Joaquin property. Assays and rock sampling around RD0006, located one kilometre south from Joaquin, suggest that the La Negra vein may become gold rich in this area, and that is now being drill tested.”

Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF