PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
HUNT MINING CORP DRILLS AT ITS LA JOSEFINA PROJECT, SANTA CRUZ
14/06/2011

Hunt Mining Corp Intersects Second Wide Interval of Strong Gold Mineralization in the Sinter Area: La Josefina Project, Santa Cruz Argentina

Hunt Mining Corp. is pleased to announce the intersection of a second wide interval of strong gold mineralization in the Sinter Zone at the La Josefina Project in Santa Cruz province, Argentina.

The results of this latest drilling continue to confirm high-grade gold mineralization. The Sinter Zone exhibits fossil hot spring characteristics with both near surface disseminated gold, as well as underlying structurally controlled mineralization. The first wide interval of shallow mineralization intersected at the Sinter Zone in hole SSI-D11-278, as reported on May 5th, 2011 hit 19.47 meters (63.88 feet) true width of 18.83 g/t (grams/tonne) gold, including 9.48 meters (true width) of 32.04 g/t gold, and 3.00 meters (true width) of 62.87 g/t gold.

Similar to hole SSI-D11-278, but located approximately 300 meters to the north, the second wide interval of mineralization intersected at the Sinter Zone in hole SSI-D11-299, starts at the surface and includes:

Hole SSI-D11-299:

34.0 meters (111.5 feet) true width of 2.82 g/t gold, including
6.25 meters true width of 7.29 g/t gold, including
1.25 meters of 11.76 g/t gold and 0.65 meters of 15.57 g/t gold

Gold grades returned for other recent Sinter Zone holes not cited above (SSI-D11-288 to SSI-D11-298) range from below detection limit (< 0.01 g/t Au) to 30.12 g/t Au.

The drill has now been moved from the Sinter Zone to the Veta Norte Structure at the La Josefina Project. An additional drill rig continues exploration at the Corporation’s 100% owned El Gateado Project but will soon be relocated to the La Josefina Project to accelerate project development there. The Corporation continues to compile results from the Sinter Zone, which will be released upon completion.

Notes:

True widths reported above are considered to be the same as the drill hole intercept widths based on vertical orientation of drill holes, flat lying stratigraphic control of mineralization, surface mapping, and construction of cross-sections.

All drilling has been conducted in accordance with standard industry practices.
All samples are being prepared and assayed by Alex Stewart Laboratories in Mendoza Argentina.

An analysis of the Corporation’s QA/QC practices are reviewed in detail in the Corporation’s current Technical Report in respect of the La Josefina Project, which is available at www.sedar.com

Mel Klohn, Senior Technical Advisor for the Corporation, is the Qualified Person under National Instrument 43-101 who has approved the technical content of this new release.

About Hunt Mining Corp.

Hunt Mining Corp. has been an active and aggressive explorer in Santa Cruz since 2006. Since that time, the Corporation's wholly owned subsidiary, Cerro Cazador S.A., has completed a large amount of exploration activity including approximately 43,000 meters of HQ core drilling, 416 line kilometers of Induced Polarization geophysical surveys and more than 15,000 surface channel, chip, and trench samples. The Corporation is currently engaged in a resource expansion drilling campaign at the flag-ship La Josefina Project.


Vuelva a HOME

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF