PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
OROCOBRE LIMITED: QUARTERLY REPORT OF OPERATIONS
19/08/2011

Orocobre Limited: Quarterly Report of Operations For The Period Ended 30 June 2011

Salar de Olaroz Lithium-Potash Project:

-- Definitive feasibility study highlights strong project fundamentals.
-- Lithium and potassium resource estimate increased more than fourfold to measured and indicated 6.4 million tonnes of lithium carbonate equivalent and 19.3 million tonnes of potash (KCL).
-- Attractively high lithium concentration of 690 mg/L and low, reduced magnesium to lithium ratio of 2.4.
-- Battery grade lithium carbonate produced from project brines.
-- Key governmental committee approves Environmental Impact Statement addendum.
-- Local community representatives provide written support of project to key government ministry.
-- Arrangements advancing with Toyota Tsusho Corporation and Japanese financing institutions.

Salinas Grandes Lithium-Potash Project:

-- Initial drilling program confirms favourable exploration potential.
-- Brine chemistry is attractive, with expected high lithium-potash recoveries from a low-cost process.

Corporate

-- Bruce Rose appointed Vice President - Corporate Development.
-- Strong cash position of A$38m at end of the quarter.

Salar De Olaroz Lithium-Potash Project

Feasibility Study and Resource Upgrade

On 3rd May 2011, the Company announced the results of its definitive Feasibility Study of the Salar de Olaroz lithium-potash brine project in Jujuy Project, north-west Argentina ("Olaroz Project"). The study highlights favourable economic fundamentals with low operating costs based on a large resource with attractive brine chemistry.

The Feasibility Study considered an initial annual production rate of 16,400 tonnes of battery grade lithium carbonate, with an option to produce annually 10,000 tonnes of potash within two years after the start of lithium carbonate production with a modelled project life of 40 years. The capital cost estimated for the lithium carbonate only development was US$207m with an additional US$14m required for the potash option.

The Feasibility Study estimated a low operating cash cost of US$1,512 per tonne for battery grade lithium carbonate, without valuing the potash credits and US$1,230 per tonne allowing for potash credits. This cost estimate is competitive with existing brine producers and materially less than those reported by hard rock lithium mineral projects.

The study was based on a substantially increased and upgraded resource estimate announced on 4th April 2011 of 1.75 cubic kilometres of brine at 690 mg/L Lithium, 5,730 mg/L Potassium and 1,050 mg/L Boron which is equivalent to 6.4 million tonnes of lithium carbonate and 19.3 million tonnes of potash (potassium chloride)

The drilling program also confirmed an attractive brine chemistry with an average magnesium to lithium ratio of 2.4, reduced from the 2.8 previously reported, and a sulphate to lithium ratio of 25.

Third party consulting expertise was engaged to complete key aspects of the DFS. Engineering design and cost estimates were undertaken by Sinclair Knight Merz. The resource estimate and process design engineering was undertaken by consulting hydrogeologist John Houston and consulting process engineer Peter Ehren respectively.

The Company continues to work closely with its strategic partner, Toyota Tsusho Corporation, to finalise joint venture agreements, due diligence and debt financing in preparation of advancing the project to commercial production once final provincial government approvals are received.

Further information of the Olaroz Project resource estimate and Feasibility Study is available in the Company's announcements of 4 April and 3 May 2011 respectively.

Battery Grade Lithium Carbonate Produced from Olaroz Brines

In early April 2011, the Company announced that it had reached the important milestone of producing battery grade lithium carbonate from Salar de Olaroz brines. Analysis showed that this lithium carbonate's purity was greater than 99.9% (excluding loss of ignition and moisture content), and of higher purity than the battery grade material specifications sold by existing producers. This material was produced by refining a lower purity product with recirculated brines. The Company continues to produce material of this quality for marketing purposes. Further information is available in the Company's announcement of 8 April 2011.

Approval of Environmental Impact Statement Addenda and Update on Approvals Process.

In late June 2011, the Company announced that a key provincial government body in Jujuy, the Unit of Mining Environmental Management ("UGAMP"), had approved the addenda to the environmental impact statement ("EIS") for the Salar de Olaroz lithium-potash project. UGAMP is the committee comprising members from various governmental departments, stakeholder groups, and local communities which reviews EIS's prior to approval by Jujuy's provincial Director of Mines and Energy Resources.

The addenda updated the previously approved EIS with the results of company's extensive engineering and design work undertaken for Definitive Feasibility Study. In addition, the addenda addressed the development of a gas pipeline to support the energy needs of the Olaroz operation.

Importantly, during the quarter the Olaroz project also received support of representatives of communities in proximity to the project site in the form of a letter to the provincial Minister of Production. These communities strongly urged the granting of all requisite approvals to allow commercial production. Management remains confident that local support will lead to a timely final approval to build the project.

In March 2011, the Jujuy government declared lithium a strategic mineral resource and introduced a secondary approvals process for lithium related projects. As a result, projects now require EIS approval, positive assessments by a Committee of Experts, and joint approval by the province's Minister of Production and the Secretary General. This new regulatory process affects the Salar de Olaroz and Salar de Cauchari lithium-potash projects, but does not affect the Salinas Grandes project in Salta Province.

Management believes that the secondary approvals process is advancing favourably and expects that final approval will be granted within a reasonable timeframe. The Company is not aware of any opposition to the Olaroz project being lodged with the provincial Minister of Production or the Committee of Experts. Furter information on the approvals process is available in the Company's announcements of 27 May and 20 June 2011.

Salar de Salinas Grandes Potassium-Lithium Project (Orocobre 85%)

Subsequent to the end of the quarter, on July 18th, the Company announced encouraging results of the initial drilling program at the Salinas Grandes lithium-potash project in Argentina's Salta province. Salinas Grandes is located 70 kilometres southeast of the Company's Salar de Olaroz project.

The drilling program consisted of 12 triple-tube diamond core holes with an average spacing of 3.3 km in the east of the salar, where most drilling was done. Holes were drilled vertically to between 60 and 75 m depth, with one hole (HCJ007D) drilled to 71 m with a diamond core and to 180 m total depth with a tricone. Down hole geophysical logging was conducted on six of the holes, including HCJ007D.

The drilling program analytical results show the presence of two brine bodies with good grades and significant exploration potential. The first is a continuous shallow brine body from surface to approximately 20m. It occurs over an extensive area of approximately 170 square kilometres of which approximately 110 square kilometres are located within Orocobre's properties.

Drilling results in the shallow brine body give average(i) values of 741mg/l lithium and 10,000mg/l potassium which represents a significant exploration target. Drilling shows that brackish water underlies this shallow brine body through much of the salar. A deeper brine body, extending to 50-80m depth, occurs over approximately 17 square kilometres in the centre of the salar, of which 13 square kilometres are in the Company's properties with the aforementioned brackish water surrounding the brine body.

Samples in both brine bodies exhibit attractively low Mg/Li ratios, averaging 2.8 for all samples where lithium values are above detection. Sulphate levels are very low, ranging from 98 mg/l on the margins of the salar to a maximum of 5030 mg/l in the centre of the salar, with an average of 1480 mg/l.

Brine chemistry exhibits favourable ratios of magnesium-to-lithium and potassium-to-lithium, combined with very low levels of sulphate. Management believes that these chemical characteristics are well suited for conventional processing techniques that provide high recovery rates at low operating costs. The low sulphate levels indicate that there is high potash recovery potential from this resource, estimated at eight tonnes of potash per tonne of lithium carbonate production.

The close proximity of Salinas Grandes to the Company's Salar de Olaroz project provides potential operational synergies. One potential synergy is the processing of concentrated Salinas Grandes lithium brine at an expanded Olaroz lithium carbonate plant following potash recovery at Salinas Grandes.

The Company's current focus is to complete an analysis of the resource estimate and to validate the brine extractability. Porosity determinations pending from the British Geological Survey laboratories and a shallow auger drilling program are key next steps in the resource estimate process. As well, pump testing has commenced to assess extractability of the near surface brine.

Further technical information on Salinas Grandes is provided in the Company's announcement of 18 July 2011.

Corporate

Appointment of Vice-President Corporate Development

Subsequent to the end of the quarter, on 27 July 2011, the Company announced the appointment of Mr Bruce Rose as Vice President, Corporate Development. In this role, Mr. Rose will have overall responsibility for Orocobre's corporate development initiatives and communications with a particular emphasis on North American investor relations. He will be based in Vancouver, British Columbia.

Mr. Rose has extensive experience in corporate development, investor relations, and operational roles within the resources and transportation sectors. Most recently, Mr. Rose was Chief Operating Officer for Ara Safety Inc. Previously, he was Vice President of Corporate Development for the Ainsworth Group of Companies, a leading integrated manufacturer of engineered wood products. During this time he was responsible for joint venture initiatives with a number of Asian partners. Before that, he held various senior leadership positions over 17 years in the rail transportation sector.

Mr. Rose holds an M.B.A. from The University of British Columbia and a B.Sc. from the University of Victoria.

Cash Position

At the end of the quarter, the company had a strong cash position of A$38m.

Paul Crawford, Company Secretary