-DIAMOND DRILLING SUCCESSFULLY CONFIRMS SAND AND GRAVEL DOMINANT LITHOLOGIES
-ADDITIONAL AQUIFER IDENTIFIED IN THE FRACTURED BASEMENT, POTENTIALLY INCREASING RESOURCE
-FIRST PUMP TEST WELL SUCCESSFULLY DRILLED AND INSTALLED
TWO OF THREE PLANNED MONITORING WELLS COMPLETED
Toronto, Ontario: Rodinia Lithium Inc. ("Rodinia" or the "Company") (TSX-V: RM; OTCQX: RDNAF) is pleased to provide an update on progress at its Salar de Diablillos project ("Diablillos" or "Salar") located in Salta Province, Argentina. Diamond drilling on the Salar commenced during the first week of July and has successfully confirmed the dominant lithologies identified by the Company's extensive reverse circulation drilling campaign. The vast majority of the lithologies intersected during diamond drilling have been sand and gravel. Both of these units tend to produce acquifers with high specific yield values and are seen by management as favourable for production wells.
In addition, the Company is pleased to announce that drilling and installation of the first pump test well is complete. The first pump test will take place at the site where D-RC-16 was drilled. Two of three planned monitoring wells have also been drilled and are in the process of being screened.
William Randall, President & CEO of Rodinia, commented "The lithologies intersected during diamond drilling confirm the favourable aquifer properties identified during reverse circulation drilling last year. This is a major step towards de-risking the project and will provide a great deal of certainty as to the potential of the deposit. Having completed the first pump test well, we are now well on our way to defining the productive capacity of Diablillos."
Diamond drill holes D-DD-01 and D-DD-02 have been completed, intersecting the basement at 186 metres and 102 metres respectively. The drill holes continued within the basement encountering highly fractured material with brine from 102 to 156 metres in the case of D-DD-01. This represents a potential aquifer that was not included in the previously reported recoverable resource estimate. Rodinia will issue a detailed press release on holes D-DD-01 and D-DD-02 once sample results have been received from the laboratory.
The Project is supervised by Ray Spanjers, Rodinia's Manager of Exploration. Mr. Spanjers is considered a qualified person, as defined by National Instrument 43-101, and has reviewed and approved the scientific and technical information in this release. According to the Company's sampling protocol, sample size is to exceed 500 millilitres and be stored in clean, secure containers for transportation. The prepared samples are then forwarded to the ALS Laboratory Group, Environmental Division, in Fort Collins, Co (USA) for analysis. A rigorous QA/QC program is implemented consisting of regular insertion of standards and blanks to ensure laboratory integrity.