PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
ARTHA RESOURCES: DRILLING UPDATE AT IVAN ALBERTO PROPERTY
19/09/2011

Vancouver, British Columbia - Artha Resources Corporation (TSX.V: AHC) is pleased to announce that the Company has completed a total of eight (8) diamond drill holes, for a total of approximately 1,750m in a planned 14 hole program (Table 1). These holes have all been drilled in the north eastern part of the project and are designed to test the lateral and vertical continuity of the vein swarm previously mapped. The vein system has a surface extent of almost four kilometers in strike length and a total combined width of over one kilometer (Map 1). Four main veins have been targeted in this first phase of drilling, Morocha, Eva, Ivana and Mercedes in the NE part of the project (Map 2). Assays have been received from four holes to date and are summarized in Table 2. Two cross sections have been drafted and are shown in Maps 3 and 4 depicting mineralized intersections.

Highlights;

  • Silver dominates metallic mineralisation consistent with surface geochemistry, with associated base metals intersected in all holes.
  • All veins demonstrate good vertical and lateral continuity with up to 12 veins intersected in individual holes (DDH-IA-05), ranging from 0.1m to 2.3m in width.
  • A strike length of only 630m has been tested, with over 3km of strike length remaining untested.
  • Not all mapped veins have been intersected in completed drill holes with north western veins still remaining undrilled due to topographical constraints (Map 2).
  • Low grade silver, up to 29g/t, intersected over variable widths with associated copper, lead and zinc mineralisation intersected in all holes.
  • Structurally controlled dilatant zones associated with cross cutting faults where broader zones of mineralisation have been observed at surface, up to 8m wide (Photo 1), will be targeted in proposed holes.
  • Drilling has delivered positive preliminary results confirming the existence of an interpreted large low sulphidation, sheeted vein style silver-base metal-carbonate system.
  • Drilling is continuing with further assays expected in coming weeks.


The Ivan Alberto project is located in the southern part of the Sierra de Quichagua, Jujuy Province Northern Argentina (Map 1). The geology of the area consists of thin-beds of pelitic sediments locally interbedded with 2m-10m thick quartz sandstone beds belonging to the Cochinoca-Escaya Magmatic-Sedimentary Complex of Ordovician age. These sediments have been unconformably covered by Tertiary andesites to the northern and northeastern part of the area. Fresh dacite intrusive porphyries have been mapped to the south, where they occur aligned on a NE-SW fracture system.

The structural pattern shows a well-defined NE-SW trend characterized by reverse faults and folding. Intense fracturing and laminated veins parallel to the NE-SW local bedding have been defined in the southeastern flank of the Sierra de Quichagua, where it forms a broad sheeted zone (4km length x 1km width) originated by compressive stress.

Geological mapping has identified a well defined epithermal vein system striking N40-65E and at least 3.5km length, where ten (10) main mineralized structures and accessory sheeted veins occur: Eva, Morocha, Ivana, Mercedes, Colorada, Liliana, Mariana, Irene, Linda y Morena. The veins are all parallel to bedding and dip 45-85SE; vein thickness ranges between 0.10 to 5.0m. Broader zones of sulphide mineralisation have been observed at surfaced with associated massive sulphide mineralization (Photos 1 and 2). These zones provide key drilling targets.


Photo 1: 8m wide mineralized zone at surface.


Photo 2: Massive sulphide sample adjacent to cross cutting fault.

The mineralization consists of base metal sulphides: sphalerite, galena, chalcopyrite and arsenopyrite, and usually occurs disseminated in quartz and carbonate veins, forming banded textures. Massive sulphides have been observed in rocks adjacent to cross cutting faults (Photo 2). Gold occurs in native submicroscopic particles sporadically in the system.

Map 1



Table 1: Drill Hole locations and status

HOLEEASTERNNORTHERNELEVATIONAZIMUTHDIPLENGTHSTART DATEEND DATESTATE
DDH-IA-01
796,705
7,478,174
3,875
310°
-50
250
Proposed
DDH-IA-02
796,996
7,478,483
3,845
320°
-50
250
Proposed
DDH-IA-03
797,336
7,478,935
3,765
322°
-50
250
Proposed
DDH-IA-04
797,749
7,479,370
3,845
316°
-45
242.35
10/08/2011
06/09/2011
Completed
DDH-IA-05
797,749
7,479,370
3,845
316°
-60
250
06/09/2011
18/09/2011
Completed
DDH-IA-06
797,912
7,479,549
3,795
320°
-45
222.95
01/08/2011
12/08/2011
Completed
DDH-IA-07
797,912
7,479,549
3,795
320°
-60
265.45
12/08/2011
03/09/2011
Completed
DDH-IA-08
797,982
7,479,701
3,780
335°
-70
250.45
19/06/2011
29/06/2011
Completed
DDH-IA-09
798,137
7,479,851
3,770
315°
-45
210
06/09/2011
18/09/2011
Completed
DDH-IA-10
798,137
7,479,851
3,770
315°
-65
270
Proposed
DDH-IA-11
798,267
7,480,067
3,813
315°
-50
200
Proposed
DDH-IA-12
797,960
7,479,296
3,730
320°
-45
91.5
02/07/2010
15/07/2011
Completed
DDH-IA-13
797,960
7,479,294
3,730
320°
-80
215.07
16/07/2011
29/07/2011
Completed
DDH-IA-14
797,793
7,479,140
3,902
320°
-45
150
Proposed
          TOTAL3117.77      
HoleFrom (m)To (m)Width (m)Au g/tAg g/tCu_%Pb_%Zn_%
DDH-IA8
35.15
35.35
0.20
0.084
17.00
1.91
0.02
1.12
DDH-IA8
136.00
138.48
2.48
0.003
2.21
0.05
0.06
0.31
DDH-IA8
178.50
180.00
1.50
0.003
2.00
0.01
0.02
0.22
DDH-IA12
16.45
16.50
0.05
0.02
1.00
0.06
0.00
1.03
DDH-IA12
21.00
22.10
1.10
0.04
3.33
0.39
0.01
0.91
DDH-IA12
29.51
29.61
0.10
0.02
29.00
0.07
1.26
8.68
DDH-IA12
35.75
36.15
0.40
0.04
5.00
0.36
0.04
2.07
DDH-IA12
75.90
77.45
1.55
0.10
3.42
0.14
0.10
0.11
DDH-IA12
78.65
78.90
0.25
0.04
2.00
0.05
0.13
0.17
DDH-IA13
66.40
66.45
0.05
0.01
0.70
0.03
0.00
0.19
DDH-IA13
85.70
86.70
1.00
0.02
1.00
0.10
0.02
0.13
DDH-IA13
97.80
98.00
0.20
0.01
14.00
0.35
0.13
0.09
DDH-IA13
100.82
101.55
0.73
0.02
6.00
0.27
0.11
0.20
DDH-IA13
103.45
103.55
0.10
0.01
20.00
0.06
0.69
0.01
DDH-IA13
160.27
160.70
0.43
0.01
2.00
0.01
0.04
0.16
DDH-IA13
190.20
190.30
0.10
0.01
0.70
0.07
0.01
0.48
DDH-IA13
212.45
212.75
0.30
0.02
1.00
0.17
0.00
0.65
DDH-IA6
74.35
74.80
0.45
0.01
3.00
0.04
0.05
3.07
DDH-IA6
115.70
116.20
0.50
0.01
4.00
0.02
0.07
0.49
DDH-IA6
121.10
121.85
0.85
0.01
2.00
0.03
0.01
0.52
DDH-IA6
125.00
125.30
0.30
0.01
18.00
0.04
0.50
1.10
DDH-IA6
137.85
138.30
0.45
0.01
4.00
0.06
0.11
0.04
DDH-IA6
176.60
177.50
0.90
0.01
1.00
0.01
0.03
0.12

Table 2: Drill Hole assays received to date.

Artha is pleased by the results to date in our inaugural drilling program on this exciting project and looks forward to providing further market updates as the program continues.

Map 2: Drill hole surface traces



Map 3: DDH-IA08



Map 4: Cross section DDH-IA13 and DDH-IA12



Charles Straw, B.Sc., is the qualified person under NI 43-101 responsible for the technical information in this news release.

Artha was founded by a team of mining industry professionals with a proven track record in project generation, exploration, mining and finance. The team's primary goal is to build Artha into a world class mining company, focused on the discovery, development and mining of economic minerals deposits globally.

On Behalf of the Board of Directors,

"Todd McMurray" President

For Information Contact:
Todd McMurray
President, Director
Tel: 1 604 648 1530
Email:
todd@artharesources.com
www.artharesources.com


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF