PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
EXTORRE ANNOUNCES FILING OF NI 43-101 TECHNICAL REPORT FOR CERRO MORO
19/12/2011

Vancouver, B.C., December 19, 2011 – Extorre Gold Mines Limited (AMEX:XG; TSX: XG; Frankfurt: E1R, “Extorre” or the “Company”) is pleased to announce the filing of an updated National Instrument 43-101 compliant mineral resource estimate for its Cerro Moro project.

The technical report was prepared by independent consultants Cube Consulting Pty Ltd.

To view the full technical report click here. - 57.9MB pdf download

Technical Report Highlights:

Indicated Category Resource: 1.35 million ounces gold equivalent* (2.42 million tonnes (“Mt”) at 7.4 g/t gold and 498 g/t silver, for a gold equivalent grade** of 17.4 g/t), plus

Inferred Category Resource: 1.05 million ounces gold equivalent* (4.74 Mt at 3.5 g/t gold and 172 g/t silver, for a gold equivalent grade** of 6.9 g/t gold).

* Gold equivalent ounces are calculated by dividing the silver ounces by 50, then adding those ounces to the gold-only ounces.

** Gold equivalent grade is calculated by dividing the silver assay result by 50, adding it to the gold value and assuming 100% metallurgical recovery.

The new resources will form the basis of an updated mining and economic study for the project (Preliminary Economic Assessment “PEA-3”) scheduled for release late in Q1-2012.

For further information please reference the NI 43-101 report entitled "Independent Technical Report (43-101): Resource Estimation for Extorre’s Cerro Moro Project, Santa Cruz Argentina" dated December 16th, 2011 filed on SEDAR (www.sedar.com). The technical report was prepared by Mr. Ted Coupland, MAusIMM(CP), Director and Principal Geostatistician of Cube Consulting. The mineral resource estimates have been classified and reported in accordance with the CIM guidelines (CIM 2005) and National Instrument NI 43-101, Standards of Disclosure for Mineral Projects. Mr. Ted Coupland is ‘independent’ and a ‘qualified person’ as defined by NI 43-101.

Exploration Continues:

Following the year end break, exploration utilizing four rigs is scheduled to continue at Cerro Moro. Two rigs will continue to delineate the Zoe deposit and potential extensions, with one rig testing extensions at depth and the other rig exploring for repetitions of the Zoe deposit up to three kilometers to the east (“Zoe East”). Recent drilling appears to have successfully intersected what is interpreted to be the Zoe structure however visual indications suggest that the early intercepts are high in the system, a geological situation common to the Zoe and the Martina deposits. Deeper step back holes are planned. Other new targets defined by Extorre’s geological team will also be tested.

Drilling to provide geotechnical data to assist in detailed open pit planning of pit wall angles and slope stability is also being conducted. This data will feed into PEA-3.

Eric Roth, President and CEO of the Company and a “qualified person” within the definition of that term in National Instrument (“NI”) 43-101, Standards of Disclosure for Mineral Projects, has supervised the preparation of the technical information contained in this news release.


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Teléfono/s
-
Rubros

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF