PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
HUNT MINING CORP. DRILLING INTERSECTS PRECIOUS METAL MINERALIZATION NEAR SURFACE AT LA JOSEFINA, SANTA CRUZ, ARGENTINA
19/10/2011

LIBERTY LAKE, WASHINGTON--(Marketwire - Oct. 19, 2011) - Hunt Mining Corp. (the "Corporation") (TSX VENTURE:HMX) is pleased to announce the latest drill results from the Sinter zone located on the La Josefina Project in Santa Cruz province, Argentina. A total of 6 holes were completed in the Sinter area, with all results coming from surface to maximum depth of 62.5 meters. The Sinter zone exhibits fossil hot spring deposit characteristics with both near-surface disseminated gold, as well as underlying structurally controlled mineralization.

A total of 16 holes have been drilled at this target, with previous Sinter results having been released on May 5th, 2011 which included Hole SSI-D11-287 assaying 19.47 meters (63.88 feet) of 18.83 g/t gold. Of the most recently reported assay results, Hole SSI-D11- lies 50 meters east-southeast of hole SSI-D11-287.

Management intends to continue exploration at the Sinter zone as part of the enhanced exploration schedule commencing immediately.

Highlights from the 6 Sinter drill holes include:

Hole SSI-D11-341:

  • From surface; 7 meters true width (23 feet) of 5.35 g/t gold, including           
    • 1 meter, true width, (3.3 feet) of 15.6 g/t gold               
    • 1.2 meters, true width, (3.9 feet) of 15.7 g/t gold

Hole SSI-D11-342:

  • At 4 meters depth; 1.3 meters, true width, (4.3 feet) of 6.36 g/t gold,

Hole SSI-D11-343:

  • At 2.5 meter depth; 4.5 meters, true width, (14.8 feet) of 9.5 g/t gold, including           
    • 0.60 meters, true width, (2 feet) of 18.4 g/t gold               
    • 0.50 meters, true width, (1.6 feet) of 34.36 g/t gold
  • At 16 meters depth; 2 meters true width (6.6 feet) of 6.89 g/t gold
  • At 23 meters depth; 2 meters true width (6.6 feet) of 7.92 g/t gold

Gold and silver grades returned for other recent Sinter holes not cited above (SSN-D11-344, 345, and 346) range from below detection limit (< 0.01 g/t Au) to 0.44 g/t gold.

A table with all 2011 drill results can be viewed at www.huntmining.com.

Notes:

  • True widths reported above are considered to be the same as the drill hole intercept widths based on vertical orientation of drill holes, flat lying stratigraphic control of mineralization, surface mapping, and construction of cross-sections.
  • All drilling has been conducted in accordance with standard industry practices.
  • All samples are being prepared and assayed by Alex Stewart Laboratories in Mendoza Argentina.
  • An analysis of the Corporation's QA/QC practices are reviewed in detail in the Corporation's current Technical Report in respect of the La Josefina Project, which is available at www.sedar.com

Mel Klohn, Senior Technical Advisor for the Corporation is the Qualified Person under National Instrument 43-101 who has approved the technical content of this new release.

About Hunt Mining

Hunt Mining Corp. has been an active and aggressive explorer in Santa Cruz since 2006. Since that time, the Corporation's wholly owned subsidiary, Cerro Cazador S.A., has completed a large amount of exploration activity including approximately 53,000 meters of HQ core drilling, 416 line kilometers of Induced Polarization geophysical surveys and more than 15,000 surface channel, chip, and trench samples. The Corporation is currently engaged in a resource expansion drilling campaign at the flag-ship La Josefina Project. Historical results and additional information can be viewed at www.huntmining.com.

Contact Information:

Hunt Mining Corp.
Dean Stuart
Investor Relations
(403) 517 2270
dstuart@huntmining.com

Hunt Mining Corp.
Viresh Varma
Director of Corp. Development
(647) 588 0460
vireshvarma@huntmining.com

Hunt Mining Corp.
Matthew J. Hughes
President and CEO
(509) 892-5287
mhughes@huntmining.com
www.huntmining.com

Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Teléfono/s
- 1.509.892.5287 Fax:1.509.892.5318
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF