PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
MALBEX Q1 UPDATE
20/03/2012

March 20, 2012 – Malbex Resources Inc. (TSX-V:MBG) has filed its interim financial statements and MD&A for the three months ended December 31, 2011 on SEDAR (www.sedar.com). The documents are also available at www.malbex.ca/Investors/Reports.

“While we are in the midst of the drill season at our lead Del Carmen project, we have only released results from seven drill holes to date. The majority of our results are yet to come, including drill holes already completed on four new targets as well as drilling to expand our Rojo Grande deposit,” said Tim Warman, President and CEO. “The recent acquisition of two promising copper-gold projects in Argentina positions us well for year-around exploration and news flow.”

Recent highlights:

  • Drilling is underway at our lead Del Carmen project, with 1,818 metres in 7 holes reported to date for the 2011/2012 season. Significant results include:
    • Hole 57A with 109 metres grading 2.05 g/t gold and 7.3 g/t silver
    • Hole 63 ended in mineralization after 157.5 metres grading 0.42 g/t gold and 7.7 g/t silver
  • Completion of a 45 line-kilometre Titan 24 geophysical survey, which has identified new drill targets in the Del Carmen Norte hydrothermal alteration system
  • Commencement of phase 2 metallurgical (column leach) testing of seven composites from the Rojo Grande deposit
  • Acquisition of two copper-gold projects in the Argentinean provinces of Catamarca (Quebrada Seca) and La Rioja (Chalchalero)
  • December 31, 2011: Working capital of $11.6 million and cash-on-hand of $11.3 million compared with working capital of $15.8 million and cash-on-hand of $16.1 million at September 30, 2011

Peter Stewart, PhD, Vice-President Exploration of Malbex Resources Inc., is a Professional Geoscientist in the Province of Ontario, and is the Qualified Person as defined by NI 43-101 responsible for the technical information presented in this news release.

About Malbex

Malbex Resources Inc. is a gold exploration company led by experienced management and directors with projects in Argentina and Peru. In April 2010, Malbex made a near-surface, gold-silver oxide discovery at Del Carmen, its lead project in Argentina. Released in September 2011, the first-ever National Instrument 43-101-compliant, inferred mineral resource estimate for the Rojo Grande deposit at Del Carmen measured 25.4 million tonnes grading 1.00 g/t gold and 13.3 g/t silver for 816,600 ounces of contained gold and 10.9 million ounces of contained silver. The Del Carmen project is located in the El Indio Gold Belt, which contains more than 35 million ounces of gold in current reserves and past production, including Barrick’s Veladero mine and Pascua-Lama project. For more information, please visit www.malbex.ca.

FOR FURTHER INFORMATION PLEASE CONTACT:

Tim Warman, President and Chief Executive Officer
Marla Gale, VP Investor Relations
Tel: (416) 628-0215
email: ir@malbex.ca


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Email
Teléfono/s
- 416-628-0215 - 1-866-648-1814 (Toll free within North America)
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF