PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
MARIFIL REPORTS POSITIVE DRILL RESULTS FROM SAN ROQUE PROJECT IN ARGENTINA
14/02/2012

VANCOUVER, B.C. - FEBRUARY 14, 2012, MARIFIL MINES LTD. (MFM: TSX-V) ("Marifil" or "the Company") announces it has received the Phase 2 drilling program assay results from its joint venture partner NovaGold Resources Inc. (NovaGold) on Marifil's San Roque gold prospect, Rio Negro Province, Argentina. Table 1 shows the significant drill intercepts.

Table 1
     
total
AuEq
Au
Ag
In
Pb
Zn
 
From
to
meters
gpt
gpt
gpt
gpt
%
%
DDHMSR-0016
130.0
163.0
33.0
1.93
1.28
16.49
3.59
0.17
0.40
 
175.0
191.0
16.0
1.37
0.52
20.42
9.71
0.16
0.51
 
   
49.0
1.75
1.03
17.78
5.59
0.16
0.44
DDHMSR-0017
185.0
218.0
33.0
1.04
0.15
4.05
6.59
0.58
0.89
 
   
33.0
1.04
0.15
4.05
6.59
0.58
0.89
DDHMSR-0018
44.0
66.0
22.0
1.65
0.79
6.70
10.55
0.24
0.96
 
118.6
156.0
37.4
3.06
0.62
8.05
75.42
0.39
2.42
 
242.0
252.0
10.0
1.94
0.32
51.69
1.93
0.42
0.71
 
   
69.4
2.45
0.63
13.91
44.26
0.34
1.71
DDHMSR-0019
47.0
57.0
10.0
1.61
0.72
6.68
9.58
0.22
1.06
 
116.9
133.0
16.2
4.63
1.45
6.64
114.19
0.28
3.17
 
144.8
186.0
39.2
1.85
0.89
3.41
19.44
0.18
1.14
 
   
65.4
2.50
1.00
4.71
41.35
0.21
1.63
DDHMSR-0020
5.0
20.0
15.0
1.35
0.25
3.38
24.64
0.34
1.16
 
44.0
93.0
49.0
1.35
0.26
14.33
1.17
0.48
1.08
 
101.0
153.2
52.2
2.29
0.93
19.05
6.08
0.63
1.16
 
   
116.2
1.77
0.56
15.03
6.40
0.53
1.13
DDHMSR-0021
33.5
47.0
13.5
2.73
1.72
32.22
6.45
0.42
0.14
 
   
13.5
2.73
1.72
32.22
6.45
0.42
0.14
DDHMSR-0022
78.0
131.8
53.8
1.97
0.14
8.25
30.75
0.63
1.97
 
221.4
236.0
14.6
3.31
0.18
24.12
5.79
1.86
3.27
 
   
68.4
2.26
0.15
11.63
25.42
0.89
2.25
DDHMSR-0023
136.0
156.4
20.4
4.48
0.61
22.91
71.45
2.19
2.97
 
   
20.4
4.48
0.61
22.91
71.45
2.19
2.97
DDHMSR-0026
32.0
47.0
15.0
1.32
0.15
48.42
2.89
0.12
0.21
 
115.4
134.0
18.6
2.57
0.92
50.35
3.18
0.43
0.79
 
148.0
160.5
12.5
1.23
0.57
11.00
2.96
0.28
0.53
 
   
46.1
1.80
0.57
39.04
3.03
0.29
0.53
DDHMSR-0027
137.0
151.0
14.0
1.05
0.05
4.13
1.38
0.65
1.15
 
   
14.0
1.05
0.05
4.13
1.38
0.65
1.15
DDHMSR-0028
106.0
144.0
38.0
1.32
0.31
5.46
16.39
0.37
1.05
 
   
38.0
1.32
0.31
5.46
16.39
0.37
1.05
DDHMSR-0029
30.0
45.0
15.0
1.12
0.17
1.99
10.31
0.57
0.99
 
87.0
137.0
50.0
4.42
0.51
14.50
80.44
1.71
3.64
 
   
65.0
3.66
0.44
11.62
64.25
1.44
3.03
DDHMSR-0030
14.0
34.0
20.0
1.06
0.12
1.74
20.50
0.45
0.87
 
142.0
179.0
37.0
1.28
0.73
11.08
0.56
0.20
0.44
 
   
57.0
1.20
0.52
7.80
7.56
0.29
0.59
DDHMSR-0032
44.0
88.0
44.0
1.00
0.08
4.28
1.53
0.57
1.06
 
108.0
203.0
95.0
1.25
0.14
6.46
6.30
0.68
1.11
 
 
 
139.0
1.17
0.12
5.77
4.79
0.64
1.10
DDHMSR-0033
10.1
23.0
12.9
1.06
0.48
8.17
9.95
0.30
0.29
 
55.0
136.0
81.0
1.54
0.85
9.15
2.67
0.31
0.63
 
   
93.9
1.48
0.80
9.01
3.67
0.31
0.58
DDHMSR-0034
0.0
35.0
35.0
3.17
2.27
42.62
0.08
0.03
0.08
 
155.5
193.0
37.5
1.57
1.12
15.30
0.12
0.11
0.18
 
   
72.5
2.35
1.68
28.49
0.10
0.07
0.13

Drill Holes 24, 25 and31 contained no significant results

Table Computations Assumptions:
Significant interval defined as a minimum 10 meter interval or a
10 gram meters AuEq interval grading a minimum of 1 gpt AuEq
Internal dilution limited to 4 continuous meters of <0.5gpt AuEq
Cutoff grade of 0.5 grams/tonne AuEq
Equivalencies based on the following metal value ratios
Au:Ag                 50:1
Au:In                 87.5:1
Au:Pb                 19845:1
Au:Zn                 19845:1
assumed long term metals values of $1200/oz Au, $24/oz Ag.,
$400/kg In, $0.80/lb Pb and Zn



NovaGold's Phase 2 drilling consists of 19 holes totalling 4,278 meters, of which 961 meters above cut-off grade assay an average of 1.94 g/t equivalent gold as mineralization of gold, silver, indium and lead and zinc. There are now 108 holes totalling 15,837 meters drilled on the San Roque property. Every one of these drill holes intercepted mineralization, although some of the holes are below the grade cut-off grade used in Table 1, indicating an extensive system of mineralization over several square kilometers. Mineralization is open in all directions and at depth. Equally important, mineralization frequently starts at surface and has been followed to the bottom of the deepest holes. Marifil believes these are positive results and constitute an important discovery of a large disseminated precious metal rich polymetallic deposit which will probably be amenable to low cost bulk mining.

A drill hole location map is being posted on the Company's web site at www.marifilmines.com.

The Phase 2 drilling explores the linear northwest trending Griselda zone. An Induced Polarization (I.P.) survey defines the zone to be open to the northwest, where approximately 1.5 kilometers beyond and along trend the results of 8 reconnaissance grab samples taken during soil sampling for 200 meters across the trend returned some very good gold assays as shown in Table 2.

Table 2
Sample
Type
Au g/t
2951
Rock
3.095
2952
Rock
2.380
2953
Rock
4.895
2954
Rock
22.900
2955
Rock
0.104
2956
Rock
0.327
2957
Rock
2.569
2958
Rock
0.580


NovaGold reports they are compiling data and drafting the 2011 Annual Report. They are preparing updated geologic maps as well as updated and expanded soil geochemical maps based on an additional 846 samples. They are also constructing a 3D model in Minesite software for added interpretative modeling and potentially resource estimation as the project moves forward. With the completion of this drill program and the corresponding expenditures

NovaGold has earned a 49% interest in the project and the right to increase its ownership to 70%. NovaGold is currently considering plans for the next stage of the project.

Richard Walters, Marifil's Executive Vice President states, "San Roque has evolved through six successive drilling programs into a very valuable asset for Marifil. It is now a substantial mineral deposit discovery that may well prove to be an ore body as work continues".

QUALITYASSURANCE/QUALITYCONTROLS



NovaGold has been carrying out a very careful, systematic Quality Assurance/Quality Control program of the 2011 drilling. This work including insertion of blanks, standards, and duplicate samples. An insertion rate of 5% of all samples were blanks, standards, and duplicates.

Phase II of the drill program included 16 holes with 2554 assayed samples. Gold was assayed with a fire assay fusion procedure and Au-AA23 method. All other elements were analyzed with HF-HNO3-HClO4 acid digestion and HCl leach using the ME-MS61 method. High grade copper, silver, lead, and zinc values were determined using a four acid digestion using the AA62 method. All the assays were processed by ALS Chemex in Mendoza, Argentina.

Blank data was provided from an in house software program and then compiled into the data file. Blank material came from a Cenozoic post-mineral basalt flow found near the property. Each blank was analyzed for Au, Ag, Cu, Pb, and Zn.

Duplicate date was exported from an in house software program. Duplicate pairs were obtained from coarse reject material. Charts were plotted to show duplicate pairs and their Pass/Fail lines.

Standards: A total of 124 results from five certified reference materials were compiled and used.


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Email
-
Dirección/es
- 605 - 475 Howe Street Vancouver, BC Canada V6C 2B3
Teléfono/s
- 702-562-4880 / 509 999-7952
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF