Download this Press Release (PDF 2.94 MB)
YAMANA GOLD INC. (TSX: YRI.TO - News)(NYSE: AUY - News)(LSE: YAU.L - News) ("Yamana" or "The Company") today announced its mineral reserves and resources for the year ended December 31, 2011. The Company's total gold equivalent ounces(1) (GEO) in the proven and probable mineral reserves category increased by 2.0 million ounces to 18.6 million ounces, which represents an 11% increase over the previous year. Total measured and indicated resources were replaced and inferred GEO mineral resources increased by 39% to over 10 million ounces. The increases are net of 2011 depletion due to production of 1.1 million GEO.
HIGHLIGHTS:
-- Total proven and probable GEO mineral reserves increased to 18.6 million
ounces, an 11% increase from 2010 and includes:
-- Total gold mineral reserves of 17.0 million ounces, an increase of
10%
-- Total silver mineral reserves of 82.9 million ounces, an increase of
28%
-- Total measured and indicated GEO mineral resources of 13.6 million
ounces, replacing resources that were upgraded to reserves and includes:
-- Total measured and indicated gold mineral resources of 13.2 million
ounces
-- Total measured and indicated silver mineral resources of 23.4
million ounces
-- Total inferred GEO mineral resources increased to 10.3 million ounces,
an increase of 39% over 2010 due to new discoveries at Chapada,
Gualcamayo, Fazenda Brasiliero and CI Santa Luz and significant
extensions to known deposits at Pilar, El Penon and Mercedes.
-- Total inferred gold mineral resources of 9.1 million ounces, an
increase of 39%
-- Total inferred silver mineral resources of 63.4 million ounces, an
increase of 28%
-- El Penon - Total mineral reserves increased 20% to 3.5 million GEO
supporting an increased mine life and sustainable production of 440,000
GEO per year
-- Jacobina - Total mineral reserves increased 20% to 2.0 million ounces
with an increase of 10% in mineral reserve grade
-- Jeronimo - Total attributable mineral reserves increased 17% to 1.1
million ounces
-- Chapada - Total mineral reserves increased 6% to 3.3 million ounces with
an increase in mineral reserve grade of 9%
-- Minera Florida - Total mineral reserves increased 28% to 968,000 GEO as
the tailings are upgraded to reserves
"The success of our 2011 exploration program is demonstrated by our significant total mineral resource growth and conversion of mineral resources to mineral reserves this year. This has built on the success of our 2010 program and the growth in mineral reserves and resources from last year. The continued growth of our total resource base together with our historical conversion rates gives us confidence in the sustainability of the 1.75 million ounces of production that we expect beginning in 2014. This growth also increases the gold represented by each share in Yamana, enhancing shareholder value," said Yamana's Chairman and Chief Executive Officer, Peter Marrone. "We are now looking at the next wave of growth projects that will take us beyond 1.75 million ounces, and as Jeronimo is our next project under evaluation, it is important to note that attributable mineral reserves increased by approximately 17% this year before completion of our feasibility study or making a construction decision. We will continue to focus on building our project pipeline to deliver consistent growth in accordance with our organic growth strategy."
Mineral reserves and resources were calculated based on a gold price of $950 per ounce, a silver price of $20 per ounce and a copper price of $2.50 per pound (except where noted).
On a gold equivalent basis proven and probable mineral reserves are 18.6 million GEO for the year ending December 31, 2011, an increase of over 11 % from 2010 at 16.6 million GEO. This is comprised of 17.0 million ounces of proven and probable gold mineral reserves and 82.9 million ounces of proven and probable silver mineral reserves. Average gold grade increased by 9% with notable contributions from Chapada, Jacobina and Gualcamayo. Proven and probable copper mineral reserves were 2.6 billion pounds of copper at an average grade of 0.30% including Alumbrera.
CONSOLIDATED MINERAL RESERVES AND MINERAL RESOURCES
AS AT DECEMBER 31, 2011
----------------------------------------------------------------------------
Contained Gold Contained Silver Contained Copper
(000's ounces) (000's ounces) (Millions of lbs)
----------------------------------------------------------------------------
Total Proven and Probable
Mineral Reserves 17,038 82,940 2,569
----------------------------------------------------------------------------
Total Measured and
Indicated Mineral
Resources 13,192 23,384 986
----------------------------------------------------------------------------
Total Inferred Resources 9,142 63,426 1,218
----------------------------------------------------------------------------
Detailed mineral reserve and mineral resource tables follow at the end of this press release and are available on our website, www.yamana.com/reserveandresource.
The most notable changes are detailed below:
El Penon,Chile
Total gold equivalent mineral reserves increased by 20% to 3.5 million GEO supporting an increased mine life and a higher sustainable production level of 440,000 GEO per year. The Company has increased GEO mineral reserves for two consecutive years since 2009. In 2011, gold equivalent mineral reserve tonnage increased by 33% at an average grade of 9.7 g/t. This increase includes a portion of the Pampa Augusta Victoria (PAV) vein system which is 'open pittable' as it is near surface and easily accessible. The 2012 exploration program at El Penon will focus on the extension of PAV and areas within the North Block as well as more recent discoveries. This effort is expected to result in continued increases in mineral resources in 2012.
Chapada, Brazil
Total gold mineral reserves increased by 6% to 3.3 million ounces at an average grade of 0.25 g/t, a 9% increase from 2010. The increases are largely attributed to the inclusion of portions of the Suruca and Corpo Sul mineral resources upgrading to mineral reserves. Measured and indicated mineral resources declined slightly but with a modest increase in grade. This was expected given the exploration focus in 2011 was to upgrade mineral resources to mineral reserves and further exploration of Corpo Sul. Gold mineral reserves have increased cumulatively by 54% since 2009. Inferred mineral resources increased by 193% to 1.2 million GEO in 359.0 million tonnes of mineral resources at 0.10 g/t.
A feasibility study was completed for Suruca in late 2011 which outlines average annual gold production of 49,000 ounces over an initial five years beginning in 2013. Corpo Sul is a new discovery made during 2011. It is expected that further work at Corpo Sul will significantly contribute to 2012 growth of mineral reserves.
Jacobina, Brazil
Total proven and probable gold mineral reserves increased by 20% to 2.0 million ounces. Since acquisition of the mine, the Company has increased gold mineral reserves cumulatively by 64% representing a five-year consecutive increase. As at December 2011 mineral reserve grade increased by 10% to 2.74 g/t as the higher grade Canavieiras and Morro do Vento deposits were upgraded to mineral reserves. Since 2009, mineral reserve grade has increased by 28% from 2.14 g/t to 2.74 g/t. Measured and indicated mineral resources increased by 44% to 2.4 million ounces in 27.6 million tonnes of mineral resources at 2.70 g/t. These results warrant the Company's continuing evaluation of higher production levels at Jacobina related to the higher grade mineral reserves. This is the third year of consecutive quality improvements and increases in mineral reserves and mineral resources at Jacobina.
Gualcamayo, Argentina
Total mineral reserves were depleted by 9%. Measured and indicated mineral resources increased by 20% to 1.1 million ounces in 33.6 million tonnes of mineral resources at 1.04 g/t. Inferred mineral resources increased by 444% to 626,000 ounces in 10.3 million tonnes of mineral resources at 1.9 g/t. The mineral resource increases are a result of exploration south west of the QDD Lower West (QDDLW) deposit which intersected two large bodies of sulphide breccia similar to QDDLW. These are potentially an extension of QDDLW, sub-parallel bodies or feeders to the QDDLW. This mineralization remains open to the south west and down dip. Exploration in 2012 will focus on expanding these new discoveries and linking them with QDDLW.
Minera Florida, Chile
Total proven and probable gold equivalent mineral reserves increased by 28% to 968,000 GEO from 2010 and increased by 38% over the last two consecutive years. The 2011 increase includes the historic tailings that were upgraded to mineral reserves as a result of the impending start-up of the Minera Florida expansion in which the tailings will be processed. The tailings represent 5.7 million tonnes of mineral reserves averaging 1.35 gold equivalent g/t for 245,000 GEO. This expansion will produce approximately 40,000 GEO's per year with the first gold pour expected in March, 2012. Measured and indicated mineral resources increased by 46% to 584,000 GEO at an average gold equivalent grade of 6.5 g/t which includes new mineral resources within the main core.
Fazenda Brasileiro, Brazil
Total mineral reserves increased by 104% to 359,000 ounces at an average grade of 2.4 g/t as some mineral resources were upgraded to mineral reserves, primarily from CLX2 and Canto in addition to the remodelling of some existing mineral reserves. Measured and indicated mineral resources modestly declined as mineral resources were converted to mineral reserves through infill drilling and inferred mineral resources increased by 160% to 525,000 ounces in 4.7 million tonnes of mineral resources at 3.45 g/t. The Company has been mining at Fazenda Brasileiro for seven years after acquiring the mine in 2003 with only 2.5 years of mine life remaining based on known mineral reserves.
Mercedes, Mexico
Total proven and probable mineral reserves increased by 22% to 1.0 million GEO as a result of the increase in GEO mineral reserves, primarily from the Barrancas, Lagunas Norte and Diluvio vein structures. Measured and indicated mineral resources were replaced at 202,000 GEO, and inferred mineral resources increased by 14% to 561,000, and include the new ounces from the additional vein structure in the Barrancas zone and the more recently discovered Diluvio zone of the Lupita vein structure.
C1 Santa Luz, Brazil
Total mineral reserves increased by 24% to 1.5 million ounces as a result of exploration success down dip of the existing mineral resource in addition to the increase in the gold price assumption that had not been changed since the completion of the feasibility study. Measured and indicated mineral resources modestly declined due to the conversion of most of the mineral resources to mineral reserves. Inferred mineral resources increased by 107% to 476,000 ounces in 5.9 million tonnes of mineral resources, most of the increase was grade driven as gold grades improved by 77% to 2.53 g/t.
Ernesto/Pau-a-Pique, Brazil
Total mineral reserves increased by 11% to 791,000 ounces. Measured and indicated mineral resources increased by 14% on 2.3 million tonnes of mineral resources at 1.92 g/t to 141,000 ounces and inferred mineral resources also increased by 14% in 4.9 million tonnes of mineral resources at 1.87 g/t to 293,000 ounces. These increases can be attributed to the upgrade of mineral resources at the Lavrinha deposit to mineral reserves and the slight increase in the gold price assumptions.
Pilar, Brazil
Inferred mineral resources increased by over 200% to 1.1 million ounces in 8.2 million tonnes of mineral resources at 4.06 g/t which reflects a significant increase in grade. These mineral resource increases are attributed to exploration success down dip at Jordino and along strike to the north. The mineral reserve was unchanged from 2010 year end as the focus of the 2011 exploration program was the expansion of the total mineral resource base and discovery of new mineralized zones to support higher production levels at Pilar.
Jeronimo, Chile
Total attributable mineral reserves increased by 17% to 1.1 million gold ounces from the initial mineral reserve declared in 2010. On a 100% basis, the project has 1.9 million gold ounces in mineral reserves and 246,000 gold ounces of measured and indicated mineral resources.
During 2011, the Company completed a pre-feasibility study. The final feasibility study is expected to be delivered before mid-year 2012. The Company is completing some additional metallurgical testing and advanced engineering that are expected to increase certainty of feasibility results and have potential to increase production and recovery levels. The Company anticipates making a construction decision on Jeronimo in 2012.
2012 Exploration Program
Yamana expects to spend approximately $125 million on exploration in 2012 continuing to build on its successful record of replacing and increasing mineral reserves and mineral resources. The exploration program will focus on increasing the Company's mineral reserves and mineral resources, accelerating the development of new discoveries such as Jordino and Maria Lazarus at Pilar, the extension of Pampa Augusta Victoria and definition of a new discovery at El Penon, the expansion of high grade mineral resources at Jacobina and the development of several greenfield projects.
Qualified Person
Other than as set forth herein, Evandro Cintra, P.Geo., Senior Vice President, Technical Services for Yamana Gold Inc. has reviewed and confirmed the scientific and technical information contained within this press release and serves as the Qualified Person as defined in National Instrument 43-101.
About Yamana
Yamana is a Canadian-based gold producer with significant gold production, gold development stage properties, exploration properties, and land positions in Brazil, Argentina, Chile, Mexico and Colombia. Yamana plans to continue to build on this base through existing operating mine expansions, throughput increases, development of new mines, advancement of its exploration properties and by targeting other gold consolidation opportunities with a primary focus in the Americas.
1. Silver is reported as a gold equivalent in 2011 at a ratio of 50:1.
Silver is reported at Mercedes as a gold equivalent at a ratio of 140:1.
2. Silver is reported as a gold equivalent in 2010 at a ratio of 55:1.
Silver is reported at Mercedes as a gold equivalent in 2010 at a ratio
of 150:1.
Yamana Gold es una compañía minera global que emplea a más de 7,000 personas a lo largo de toda América. Trabajamos eficaz y eficientemente, descubriendo recursos minerales en todo el mundo y transformándolos en valor, respetando a nuestra gente, el medio ambiente y las comunidades de las que formamos parte. Guiados por los estándares más altos de integridad, diversidad y ética, nuestras operaciones y oficinas promueven el intercambio de conocimientos entre culturas, el desarrollo de la excelencia operativa y las mejores prácticas de negocios globales.
En Argentina, Yamana Gold es la propietaria del yacimiento Gualcamayo, mina de oro en la provincia de San Juan, del proyecto Cerro Moro, situado en Santa Cruz, de Minera Agua Rica, en Catamarca, y del proyecto Suyai, entre otras propiedades. Además, posee el 12,5% de Minera La Alumbrera, propietaria del yacimiento del mismo nombre.
