Osisko Mining Corporation (OSK: TSX, EWX: Deutsche Boerse) is pleased to provide an updated inferred resource estimate for its 100%-owned Hammond Reef gold project, located near Atikokan, Ontario. New drilling by Osisko and Brett Resources from January 2010 to July 2011 (approximately 300,000 metres) has significantly increased the size of the deposit. This update reports both global and in-pit resources in the inferred category. Additional drilling subsequent to July 2011 is anticipated to allow for the upgrade of the entire in-pit deposit to Measured and Indicated category by Q1 2012.
Key points:
SGS Canada Inc. of Montreal, Quebec ("SGS") are the independent resource estimate consultants who have authorized the release of the following estimates. The global Inferred resource is 10.52 million ounces of gold at an average undiluted grade of 0.62 g/t Au, based on a lower cut-off grade of 0.30 g/t Au. The table below summarizes the SGS estimates using variable lower cut-off grades:
Hammond Reef Global Inferred Resource Estimates
| Grade (g/t) | Tonnes (M) | Cut-off (g/t) | Oz (M) |
|
0.41 |
998.6 |
0.10 |
13.24 |
|
0.53 |
701.2 |
0.20 |
11.88 |
|
0.62 |
530.6 |
0.30 |
10.52 |
|
0.67 |
454.8 |
0.35 |
9.73 |
|
0.72 |
384.9 |
0.40 |
8.88 |
|
0.77 |
323.4 |
0.45 |
8.04 |
|
0.83 |
272.5 |
0.50 |
7.27 |
|
0.94 |
193.6 |
0.60 |
5.88 |
|
1.06 |
139.4 |
0.70 |
4.75 |
|
1.17 |
103.2 |
0.80 |
3.88 |
|
1.28 |
77.8 |
0.90 |
3.19 |
|
1.38 |
59.0 |
1.00 |
2.62 |
G Mining Services Inc. of Montreal, in collaboration with SGS, also estimated an in-pit inferred resource within a single Whittle-optimized pit shell using a base case gold price of US$1200 per ounce and a dilution factor of 5%. The in-pit inferred resource for the Hammond Reef gold deposit is 6.86 million ounces of gold at an average diluted grade of 0.63 g/t Au, based on a derived lower cut-off grade of 0.28 g/t Au. Sensitivity of the diluted in-pit inferred resource (based on minimum cut-off grade) to gold price is as follows:
|
Gold Price (US$) |
Grade (g/t) |
Tonnes (M) |
Strip Ratio |
Oz (M) |
|
$600 |
0.96 |
89.12 |
1.69 |
2.76 |
|
$700 |
0.87 |
126.03 |
1.29 |
3.54 |
|
$800 |
0.81 |
160.12 |
1.12 |
4.16 |
|
$900 |
0.75 |
199.75 |
1.01 |
4.81 |
|
$1000 |
0.71 |
234.40 |
0.96 |
5.32 |
|
$1100 |
0.67 |
263.24 |
0.91 |
5.70 |
|
$1200 |
0.63 |
336.58 |
1.25 |
6.86 |
|
$1300 |
0.60 |
413.13 |
1.43 |
7.96 |
|
$1400 |
0.57 |
469.68 |
1.47 |
8.66 |
|
$1500 |
0.55 |
536.12 |
1.58 |
9.51 |
|
$1600 |
0.53 |
579.81 |
1.55 |
9.95 |
|
$1700 |
0.52 |
630.77 |
1.63 |
10.54 |
|
$1800 |
0.51 |
658.23 |
1.62 |
10.79 |
The table below summarizes the undiluted in-pit estimates using variable lower cut-off grades:
Hammond Reef Undiluted Resource Estimates
within US$1200 Whittle pit shell
|
Inferred Resources |
|||
|
Grade (g/t) |
Tonnes (M) |
Cut-off (g/t) |
Oz (M) |
|
0.68 |
308.3 |
0.30 |
6.75 |
|
0.77 |
245.3 |
0.40 |
6.05 |
|
0.87 |
187.6 |
0.50 |
5.23 |
|
0.97 |
142.1 |
0.60 |
4.43 |
|
1.09 |
104.8 |
0.70 |
3.66 |
|
1.18 |
82.3 |
0.80 |
3.11 |
|
1.29 |
61.4 |
0.90 |
2.55 |
|
1.38 |
48.3 |
1.00 |
2.15 |
Sean Roosen, President and CEO of Osisko, commented: “We are very pleased with Osisko’s first inferred resource estimate for the Hammond Reef Project, which has achieved a 65 percent increase, or an additional 4.16 ounces of gold in the global resource, with respect to the previous Brett Resources estimate. While there is no doubt that the resource has a lower overall grade than Canadian Malartic, an important point to note is that the new in-pit resource for Hammond Reef has a low strip ratio of 1.25 and is quite robust, as it is based on current processing and mining costs at Canadian Malartic, adjusted for higher electrical costs in Ontario.”
“Osisko completed 300,000 metres of diamond drilling in just over a year to get to today’s inferred resource numbers, a huge achievement in such a short period of time. By February 2012 we will have completed an additional 130,000 metres of drilling on a 50 x 25 metre grid to allow for the conversion of the entire in-pit resource to Indicated category. To convert approximately one-third of the resource to Measured category, we also plan to drill an additional 70,000 metres on a 25 x 25 metre grid. The next resource update, slated for the end of Q1 2012, will be followed by feasibility for Hammond Reef”.
Details on the parameters of the resource estimates are as follows:
Osisko Mining Corporation is currently running the Canadian Malartic gold mine in Quebec as a large-scale open pit, bulk-tonnage operation. The Canadian Malartic mine is slated to be one of the largest single gold producers in Canada when full capacity is achieved in 2012. The Company is well-funded and is carrying out aggressive exploration and project development elsewhere in Canada and Latin America.
Mr. Michel Dagbert, P. Eng. of SGS Canada Inc. (global resource estimate) and Mr. Louis-Pierre Gignac, P. Eng. of G Mining Services Inc. (Whittle-optimized in-pit resource estimate) are the Qualified Persons responsible for the technical information reported herein, including verification of the data disclosed. Mr. Robert Wares, P. Geo. and Executive Vice-President of Osisko, has also reviewed and approved the technical contents of this news release.
About Osisko Mining Corporation
Osisko Mining Corporation operates the Canadian Malartic Gold Mine in Malartic, Quebec and is pursuing exploration on a number of properties, including the Hammond Reef Gold Project in Northern Ontario. Canadian Malartic's production is 100% unhedged.