Highlights
Neither the content of the company's website nor the content of any other website accessible from hyperlinks on the company's website is incorporated into, or forms part of, this announcement
Xstrata contacts:
Xstrata plc
Claire Divver
Telephone +44 20 7968 2871
Mobile +44 7785 964340
Email cdivver@xstrata.com
Alison Flynn
Telephone +44 20 7968 2838
Mobile +44 7769 314374
Email aflynn@xstrata.com
Investors & analysts
Martin Fewings
Telephone +44 20 7968 2893
Mobile +44 7990 591536
Email mfewings@xstrata.com
Caroline Yates
Telephone +44 20 7968 2878
Mobile +44 7824 826546
Email cyates@xstrata.com
Notes to editors
About Xstrata plc
We are a major producer of a range of vital commodities used in everything from constructing buildings and delivering electricity, to developing jet engines and mobile phones. We are one of the top five global producers of copper, thermal and metallurgical coal, ferrochrome, zinc and nickel and we also produce silver, lead, platinum, gold, cobalt and vanadium.
Founded in 2002 and headquartered in Switzerland, we operate in over 20 countries and employ over 70,000 people at more than 100 operations and projects around the world. We work in a responsible and sustainable way, with an entrepreneurial spirit and dynamic approach. For more information, visit www.xstrata.com.
2012 marks a transition year for Xstrata Copper as new expansion projects ramp up in the second half of the year at our Antamina joint venture and new Antapaccay mine in Peru, Ernest Henry underground mine in Australia and Lomas Bayas mine in Chile. Following the closure of the Ernest Henry open pit mine in December last year and with our Tintaya pit entering its final year of production in 2012, the transition period has resulted in planned lower mined copper output in the first quarter, with production 18% lower than the first quarter of 2011.
At Antamina, the expansion project to increase processing capacity by 38% to 130,000 tonnes per day was successfully commissioned in the first quarter and reached nameplate capacity in March 2012. As a result, our share of Antamina copper production increased by 24% with higher mill throughput from the increased capacity, together with planned higher grades and recoveries.
Higher ore throughput, improved head grades and recoveries increased copper production at the Alumbrera mine by 13% in the first quarter of 2012, as the mine was able to regain access to higher grade zones after a geotechnical event restricted access last year.
The Ernest Henry open-pit mine, which produced over 100,000 tonnes of copper last year, reached the end of its life in December 2011 and underground ore production commenced, initially at a lower rate and with lower grades, contributing 7,300 tonnes of copper in the first quarter. Underground annualised ore mining rates will increase progressively from a rate of approximately 2 million tonnes at present to 3 million tonnes by the end of this year, increasing to 6 million tonnes per annum after an underground hoisting shaft is commissioned at the end of 2013.
Planned lower grades and recoveries at Collahuasi, together with adverse weather conditions and an unplanned ball mill outage in March, decreased our share of copper in concentrate production by 34% to 29,400 tonnes in the first quarter. We expect Collahuasi’s copper production to improve in the second half of 2012 as the mine plan moves into a higher-grade ore zone. An incremental expansion to 160,000 tonnes per day will be commissioned in 2013, further increasing copper production to an annual rate of more than 500,000 tonnes per annum.
Record rainfall at our Tintaya mine restricted mining rates and access to higher ore grades, contributing to reduced copper production of 53% to 11,500 tonnes over the corresponding period as Tintaya enters its final year of operations. The adjacent Antapaccay project is on track to commence operations in the third quarter of this year and is scheduled to progressively ramp up to reach initial production rates of 160,000 tonnes per annum in 2013.
Gold production decreased by 34% to 86,800 ounces in the first quarter of 2012 compared to the previous year, mainly due to Ernest Henry’s transition to a lower production underground operation and to lower grades at Alumbrera and Tintaya.
Total mined and third party copper cathode production increased by 2% compared to the first quarter of 2011, mainly due to improved production at the Townsville refinery which experienced a shut down in the same quarter of 2011 in response to a severe cyclone event in North Queensland.
Production Data |
Q1 2012 | Q1 2011 | Year ended 31.12.11 |
| Total mined copper production (t) (contained metal) | 171,121 | 209,935 | 888,979 |
| Total mined gold production (oz) (contained metal) | 86,797 | 132,136 | 517,861 |
| Total copper cathode (t) (from mined and third party material) | 158,545 | 156,136 | 650,917 |
| Average LME copper price ($/t) | 8,329 | 9,629 | 8,826 |
| Average LBM gold price ($/oz) | 1,691 | 1,387 | 1,573 |
Total consolidated coal production increased by 9% to 21.1 million tonnes in the first quarter of 2012. This was primarily due to increased Australian and South African thermal coal volumes resulting from more consistent, uninterrupted production compared to the same period in 2011, when performance was significantly impacted by a number of uncontrollable events.
Australian thermal coal production, including metallurgical volumes, increased by 8% or 0.9 million tonnes, mainly as a result of improved performance at the Rolleston open cut and Ulan underground operations, compared to the first quarter of 2011 when flooding impacted production. The full impact of improved volumes from the Australian operations was not wholly realised due to the end of mine life closures in 2011 at the Beltana, Ravensworth West and Baal Bone operations, which were still producing in the first three months of 2011.
Australian coking coal production was down by 0.3 million tonnes in the first three months of 2012 mainly due to the timing of longwall moves at the Oaky Creek underground complex in Queensland.
South African thermal coal production increased by 20% or 0.8 million tonnes due to improved performance in the first quarter of the year, as our sites continued their transition to large scale, low cost, primarily open-cut, complexes, with Goedgevonden and ATCOM East producing at steady state volumes.
At Cerrejón, our joint venture operation in Colombia, volumes were 15% or 0.4 million tonnes higher compared to the first quarter of 2011, when production levels were impacted by more rainfall than in the first quarter of 2012.
Production Data (million tonnes) |
Q1 2012 | Q1 2011 | Year ended 31.12.11 |
|
| Total consolidated production | 21.1 | 19.3 | 85.3 | |
| Total thermal coal | 18.8 | 16.1 | 72.4 | |
| Australian thermal | 10.9 | 9.4 | 44.5 | |
| South African thermal* | 4.9 | 4.1 | 17.1 | |
| Americas thermal | 3.0 | 2.6 | 10.8 | |
| Total coking coal (Australia) | 1.4 | 1.7 | 7.6 | |
| Total semi-soft coking coal (Australia) | 0.9 | 1.5 | 5.3 | |
| Average received export FOB coal price ($/t) | ||||
| Australian thermal | 114.3 | 97.3 | 109.6 | |
| Australian coking | 224.7 | 236.5 | 265.0 | |
| Australian semi-soft coking | 180.0 | 158.8 | 202.5 | |
| South African thermal | 107.5 | 96.8 | 101.2 | |
| Americas thermal | 94.5 | 97.6 | 101.0 | |
| * | Q1 2011 production figures include Mpumalanga. Mpumalanga contributed 0.3 million tonnes in Q1 2011 and 1 million tonnes for the 2011 full year | |||
We produced 26,381 tonnes of nickel in the first quarter of 2012, 8% more than the same period last year as a result of improved mined production from both our Integrated Nickel Operations (INO) and our Falcondo ferronickel operation.
Mined nickel in concentrate production from our INO mines increased by 2%, driven by higher volumes and grade at our Raglan and Sudbury mines in Canada. A 5% increase in the volume of INO ore milled in the period was offset by lower grades from our Australian mines, as we mined disseminated ore bodies with inherently lower nickel content.
Total nickel in ferronickel production from our Falcondo operation in the Dominican Republic rose 89% to 3,576 tonnes in the first quarter, after we restarted mining activities in February 2011 to 50% of installed capacity. Falcondo’s run-rate in the first quarter of 2012 remained above planned capacity.
Our mined copper production reached 13,769 tonnes, up 10% over the same period last year, reflecting a period of significant copper contained in Sudbury’s Nickel Rim South ore. This increased mined copper production contributed to a 15% increase in refined copper production at the Nikkelverk refinery in Norway, which produced 9,385 tonnes of copper metal in the first quarter of 2012.
Production Data |
Q1 2012 | Q1 2011 | Year ended 31.12.11 |
|
| Total mined nickel production (t) (contained metal) – INO | 14,677 | 14,419 | 64,103 | |
| Total mined copper production (t) (contained metal) – INO | 13,769 | 12,539 | 55,629 | |
| Total mined cobalt production (t) (contained metal) - INO | 294 | 287 | 1,302 | |
| Total nickel production (t) | 26,381 | 24,531 | 105,925 | |
| Total refined nickel production (t) | 22,805 | 22,637 | 92,427 | |
| Total mined ferronickel production (t) (contained metal) | 3,576 | 1,894 | 13,498 | |
| Average LME nickel price ($/t) | 19,651 | 26,899 | 22,831 | |
| Average LME copper price ($/t) | 8,329 | 9,629 | 8,826 | |
| Average Metal Bulletin cobalt low grade price ($/lb) | 14.13 | 17.86 | 16.01 | |
A 12% increase in production at our Australian operations helped to offset a planned reduction in volumes at Antamina, where the mine plan continues to operate in a predominantly copper ore zone. Overall, our total zinc in concentrate production achieved similar volumes to the first quarter in 2011. Zinc metal production at our smelters was also consistent with the same period in 2011.
Total lead in concentrate production increased by 7% during the first quarter of 2012, mainly due to higher production volumes at our Australian operations as a result of improved ore grades.
As a result of higher production at Mount Isa and improvements to shipping schedules for lead bullion shipments to our UK refinery, total lead metal production was 14% higher than the same period in 2011.
Production Data |
Q1 2012 | Q1 2011 | Year ended 31.12.11 |
| Total zinc in concentrate production (t) | 239,983 | 240,749 | 974,517 |
| Total zinc metal production (t) | 182,227 | 182,357 | 737,758 |
| Total lead in concentrate production (t) | 57,643 | 53,764 | 225,743 |
| Total lead metal production (t) | 59,260 | 51,777 | 206,579 |
| Average LME zinc price ($/t) | 2,025 | 2,394 | 2,190 |
| Average LME lead price ($/t) | 2,092 | 2,605 | 2,399 |
Attributable ferrochrome production volumes were 20% lower than the first quarter of 2011, mainly due to the rescheduling of maintenance programmes and power buyback deals with Eskom, the South African national electricity supplier. In total, seven furnaces were impacted by Eskom’s requirements for consumption reductions to support their maintenance programmes.
Ferrochrome producers achieved a 17% increase in the average European benchmark price from $1.15 per pound in the first quarter to $1.35 per pound in the second quarter, driven by reduced supply in the market. Margins, however, remain under pressure as a result of continued strong mining inflation, increased standing charges and a relatively strong rand compared to the US dollar.
PGM volumes were lower than the corresponding quarter in 2011 as Eland mine continued to transition to an underground operation following the cessation of opencast operations in the final quarter of 2011. Mototolo Mine achieved nameplate production volumes with a slight increase over the comparative period in 2011.
| Ferrochrome | Q1 2012 | Q1 2011 | Year ended 31.12.11 |
| Attributable* saleable production (kt) | 252 | 316 | 1,021 |
| Indicative average published price (US¢/lb) (Metal Bulletin) | 115.0 | 125.0 | 125.0 |
| * Reflects Xstrata’s 79.5% share of the Xstrata-Merafe Chrome Venture | |||
| Platinum Group Metals | Q1 2012 | Q1 2011 | Year ended 31.12.11 |
|
| Consolidated * saleable production (oz) |
|
|
|
|
| Platinum | 18,093 | 22,367 | 92,411 | |
| Palladium |
10,296 |
11,443 | 46,968 | |
| Rhodium |
3,058 |
3,620 | 15,049 | |
| Average (London Platinum and Palladium Market) Platinum price ($/oz) | 1,608 | 1,794 | 1,720 | |
| Average (London Platinum and Palladium Market) Palladium price ($/oz) | 682 | 792 | 733 | |
| Average (Johnson Matthey) Rhodium price ($/oz) | 1,463 | 2,436 | 2,022 | |
| * Consolidated 100% of Eland and 50% of Mototolo | ||||