PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
DE GREY: MAIDEN DRILL PROGRAM COMMENCES AT SIERRA MORENA
17/05/2012

HIGHLIGHTS

• Initial 750 metre diamond drilling program at Vein Breccia Zone
• Drilling to be completed by mid-June 2012
• Previously released rock chip samples assaying up to 11.75g/t gold and 96.2g/t Silver

De Grey Mining Ltd (ASX: DEG) is pleased to advise that its maiden drill program in Argentina is to begin on Saturday 19th May at the Sierra Morena Project in Santa Cruz Province. The drilling contractor has arrived on site and is setting up on the first hole.

An initial program of approximately 750 metres of diamond drilling will be completed at the Vein Breccia Zone prospect, targeting high-level epithermal gold-silver mineralisation. De Grey's exploration at the Vein Breccia Zone has outlined a complex epithermal vein system containing precious metals mineralisation over 800 metres strike length with rock chip samples assaying up to 11.75g/t Au and 96.2g/t Ag1.

It is expected that this initial drilling program will be completed by mid-June 2012. The program will provide an initial test of the exploration model and provide vectors for further drilling when the next field season commences, expected to be September.

Drilling has started later than planned due to delays in securing a drilling contractor.

Depending on drill rates and the onset of winter weather conditions, the rig may proceed to the SM6 target, also located on Sierra Morena Project, and the Pachi prospect after the program at Vein Breccia Zone is completed.

For further information:

Gary Brabham
De Grey Mining Limited
Ph: +61 8 9285 7500


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Teléfono/s
- 61 8 9285 7500 Fax: 61 8 9285 7599
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF