PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
LUMINA COPPER PROVIDES COMMENT ON RECENT SHARE PRICE MOVEMENT AND A CORPORATE UPDATE
16/05/2012

In response to enquiries, Lumina Copper Corp. (TSX Venture: LCC) (the "Company" or "Lumina") announces that the Company is unaware of any specific reason, other than general market conditions, for the recent significant decline in the Company's share price. In particular, there have been no corporate developments or events to support the decline.

Lumina continues to explore and develop the Taca Taca project. In addition to the comprehensive drill program, the Company is undertaking engineering and metallurgical studies that will form the basis of future Preliminary Economic Assessment and Prefeasibility Studies.

On May 7, 2012, the Company released an updated mineral resource estimate on the Taca Taca project in which contained sulphide copper in the Indicated and Inferred categories increased significantly.

The salient details of the updated National Instrument 43-101 ("NI 43-101") mineral resource estimate are as follows:

Sulphide Resources (0.4% copper equivalent cut-off)

-824 million tonnes grading 0.59% copper, 0.12g/t gold and 0.018% molybdenum (0.75% copper equivalent(1)) in the Indicated category containing 10.7 billion pounds of copper, 3.1 million ounces of gold and 320 million pounds of molybdenum. The previous NI 43-101 mineral resource estimate contained 516 million tonnes grading 0.58% copper, 0.12g/t gold and 0.018% molybdenum.

-938 million tonnes grading 0.48% copper, 0.08g/t gold and 0.014% molybdenum (0.60% copper equivalent(1)) in the Inferred category containing 9.8 billion pounds of copper, 2.4 million ounces of gold and 283 million pounds of molybdenum. The previous NI 43-101 mineral resource estimate contained 880 million tonnes grading 0.43% copper, 0.08g/t gold and 0.015% molybdenum.


Oxide Resources (0.2g/t gold cut-off)

-198 million tonnes grading 0.27g/t gold in the Indicated category containing 1.7 million ounces of gold. The previous resource estimate did not contain any mineralization in the Indicated category.

-81 million tonnes grading 0.26g/t gold in the Inferred category containing 0.7 million ounces of gold. The previous NI 43-101 mineral resource estimate contained 190 million tonnes grading 0.25g/t gold.

(1) Copper equivalent calculated using US$2.00/lb Cu, US$800/oz Au and US$12.00/lb Mo and is not adjusted for mining and metallurgical recoveries as these remain uncertain. The formula used is as follows: CuEQ = Cu% + (Au g/t x 0.583) + (Mo% x 6).

The Company is conducting a planned 163,500 meter drill program (85,932 meters completed through May 3, 2012) and has 9 drill rigs (7 core and 2 reverse circulation rigs) operating. The drill program outlined above is expected to be completed during the fourth quarter of 2012.

Additional information on the updated mineral resource estimate can be found in the May 7, 2012 news release filed on SEDAR (www.sedar.com) and Lumina's website (www.luminacopper.com). An updated NI 43-101 technical report detailing the mineral resource estimate will be completed and filed on SEDAR (www.sedar.com) and Lumina's website (www.luminacopper.com) within 45 days of the May 7 announcement.

The Taca Taca copper/gold/molybdenum project is located in the Puna region of north western Argentina in Salta province, approximately 230 kilometres west of the provincial capital of Salta and 120 kilometers east of the world's largest copper mine, Escondida.

Andrew Carstensen, CPG, Vice President, Exploration and the Qualified Person as defined by NI 43-101 for the Taca Taca project has reviewed and approved the contents of this news release as they relate to the ongoing exploration and development program, and the mineral resource estimate, for the Taca Taca project.

LUMINA COPPER CORP

Signed: "David Strang"

David Strang, President & CEO

For further information contact:

David Strang, President & CEO
dstrang@luminacopper.com
tel: + 604 646 1880
fax: + 604 687 7041

 


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Teléfono/s
- 604.646.1890
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF