Malbex Resources Inc. (TSX-V:MBG) has filed its interim financial statements and MD&A for the three and six months ended March 31, 2012 on SEDAR (www.sedar.com). The documents are also available at www.malbex.ca/Investors/Reports.
“With our fieldwork at the Del Carmen project completed, we are shifting our geological team to our other lower altitude projects,” said Tim Warman, President and CEO. “Over the coming months we expect to announce the remaining 11 drill holes from Del Carmen, the results from advanced metallurgical testing of the Rojo Grande deposit, progress on our search for a partner for Del Carmen and exploration results from our other projects. In response to the severe downturn in the financing market for junior explorers, we have made some adjustments to our plans, such as seeking to joint venture Del Carmen in order to maximize our investment in exploration at our lower-cost projects in Peru and Argentina.”
Recent highlights:
1This total does not include hole 57 which was re-drilled as hole 57A after being lost in mineralization.
During the current quarter, there are approximately 20 million common share purchase warrants due to expire on June 21, 2012. Each warrant is exercisable into one common share for consideration of $0.40.
Peter Stewart, PhD, Vice-President Exploration of Malbex Resources Inc., is a Professional Geoscientist in the Province of Ontario, and is the Qualified Person as defined by NI 43-101 responsible for the technical information presented in this news release.
About Malbex
Malbex Resources Inc. is a gold exploration company with projects in Argentina and Peru. In April 2010, Malbex made a near-surface, gold-silver oxide discovery at Del Carmen, its lead project in Argentina. Released in September 2011, the first-ever inferred mineral resource estimate for the Rojo Grande zone at Del Carmen measured 25.4 million tonnes grading 1.00 g/t gold and 13.3 g/t silver for 816,600 ounces of contained gold and 10.9 million ounces of contained silver. The Del Carmen project is located in the El Indio Gold Belt, which contains more than 35 million ounces of gold in current reserves and past production, including Barrick’s Veladero mine and Pascua-Lama project. For more information, please visit www.malbex.ca.
FOR FURTHER INFORMATION PLEASE CONTACT:
Tim Warman, President and Chief Executive Officer
Marla Gale, VP Investor Relations
Tel: (416) 628-0215
email: ir@malbex.ca