PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
XSTRATA: PRODUCTION REPORT FOR THE SIX MONTHS ENDED 30 JUNE 2012
31/07/2012

Highlights:

  • Newly commissioned expansions and improved productivity delivered stronger second quarter production in coal, copper, nickel, zinc and lead compared to the first quarter
  • Total mined copper production, up by 7% quarter-on-quarter, included volumes from the Antamina expansion which successfully commissioned in March. We continue our transition to new mines and expansions that herald the start of increased copper production from the second half of 2012
  • Thermal coal volumes increased across all our regions, Australia, South Africa and Colombia, benefiting from new mines and improved productivity at existing operations compared to the same period in 2011
  • Mined nickel and ferro-nickel production rose by 5% compared to first half of 2011, following improved volumes and higher grades at our Canadian operations and a full six-month contribution from the Falcondo ferronickel operation
  • A total of ten major approved growth projects will reach commissioning in 2012: Antamina (already commissioned), Antapaccay, Lomas Bayas, Mount Margaret (copper), Ravensworth North and Ulan open cut (coal), Koniambo (nickel), Tswelopele (ferrochrome pelletising plant) and Lady Loretta and George Fisher (zinc). The commissioning of tier one growth projects will reduce overall operating costs and improve the quality and robustness of our portfolio throughout the commodity cycle.

Neither the content of the company's website nor the content of any other website accessible from hyperlinks on the company's website is incorporated into, or forms part of, this announcement

Xstrata contacts:

Media
Alison Flynn
Telephone +44 20 7968 2838
Mobile +44 7769 314374
Email aflynn@xstrata.com

Investors & analysts
Martin Fewings
Telephone +44 20 7968 2893
Mobile +44 7990 591536
Email mfewings@xstrata.com

Caroline Yates
Telephone +44 20 7968 2878
Mobile +44 7824 826546
Email cyates@xstrata.com

Notes to editors

About Xstrata plc

We are a major producer of a range of vital commodities used in everything from constructing buildings and delivering electricity, to developing jet engines and mobile phones. We are one of the top five global producers of copper, thermal and metallurgical coal, ferrochrome, zinc and nickel and we also produce silver, lead, platinum, gold, cobalt and vanadium.

Founded in 2002 and headquartered in Switzerland, we operate in over 20 countries and employ over 70,000 people at more than 100 operations and projects around the world. We work in a responsible and sustainable way, with an entrepreneurial spirit and dynamic approach. For more information, visit www.xstrata.com

Copper

Total mined copper production increased by 7% in the second quarter of 2012 compared to the first quarter.  Volumes were 18% lower than the first half of 2011 as Xstrata Copper continued its transition from older end-of-life mines to new mines and expansion projects that will increase overall production volumes in the second half of this year, including the expansion of the Antamina joint venture mine, new Antapaccay mine in Peru, Ernest Henry underground mine and Mount Margaret project in Australia and Lomas Bayas II project in Chile.

Our share of Antamina copper production increased by 39% to 68,000 tonnes in the first half due to improved mill throughput as a result of the expansion project, successfully commissioned in March, which increased plant capacity to an average of at least 130,000 tonnes per day, along with planned higher grades and recoveries.  Higher ore throughput at our Alumbrera mine together with improved head grades and recoveries increased copper production by 13% to 67,300 tonnes in the first half, as the mine regained access to higher copper grade ore zones after a geotechnical event restricted access last year.   A resolution introduced by the Argentine government in April prevented Alumbrera from selling product to export customers under its standard terms in the second quarter, impacting first half sales volumes. Concentrate shipments resumed in July after the resolution was revised allowing for repatriation of sales revenues within a more practical period.

Planned lower production at Ernest Henry contributed 14,900 tonnes in the first half of 2012 compared to 54,600 tonnes in the first half of 2011, as the operation transitions to underground mining following the completion of the low cost open pit in December 2011. Underground ore mining achieved annualised mining rates of 2 million tonnes in the first half and is scheduled to increase to around 3 million tonnes by the end of the year. This will subsequently increase to around 6 million tonnes per annum after the underground hoisting shaft is commissioned at the end of 2013. The neighbouring new Mount Margaret project commenced open pit mining activities on schedule and budget in July and first ore to the Ernest Henry concentrator is scheduled for the third quarter of this year, adding around 30,000 tonnes of copper annually to Ernest Henry’s production profile.

Planned lower grades and recoveries at our Collahuasi joint venture, together with adverse weather conditions, safety stoppages and an unplanned extended ball mill outage that began in March decreased our share of copper in concentrate production by 41% to 55,900 tonnes in the first half. Collahuasi’s copper production is expected to improve in the second half of the year as equipment availability improves following completion of the ball mill repairs through August and metallurgical recoveries improve.  Following Collahuasi’s disappointing performance and the departure in June of its chief executive officer Xstrata initiated a business improvement plan together with the other shareholders in the operation. Collahuasi’s joint venture partners are now directly managing the operation and, through a dedicated taskforce, the process of identifying and implementing operational improvements.   

At our Tintaya mine, now in its final year of mining, pit wall instability issues following record rainfall in the first quarter impacted mined volumes and limited access to higher grade ore. Copper production fell by 52% to 19,900 tonnes compared to the corresponding period the previous year. The adjacent Antapaccay mine remains on schedule and budget to commence operations and plant commissioning in the third quarter of this year.  Antapaccay will progressively ramp up to reach planned average production rates of 160,000 tonnes per annum from 2013.
At Lomas Bayas, copper cathode production at 36,600 tonnes was in line with the previous year as ore from the new Fortuna de Cobre pit began supplementing declining volumes from the original pit as part of the Lomas II project.  Additional plant infrastructure is on track for commissioning during the second half of this year which will sustain current levels of production for at least a further 12 years.  

Gold production decreased by 28% to 197,139 ounces in the first half of 2012 compared to the previous year, mainly due to lower volumes and grades at Ernest Henry and Tintaya and lower grades at Alumbrera. 

Total mined and third party copper cathode production increased by 3% compared to the same period last year. Production increased at the Townsville refinery, which last year experienced a shutdown during the first half due to a severe cyclone event in north Queensland and at the CCR refinery in Canada as initiatives to increase throughput enabled additional anodes from Altonorte to be processed.

  Six months to 30.06.12 Six months to 30.06.11 Year ended 31.12.11
Argentina – Alumbrera*      
Material mined (t) 45,892,465 33,954,549 74,428,957
Ore mined (t) 14,885,478 7,974,405 22,226,785
Copper head grade (%) 0.43 0.42 0.40
Gold head grade (g/t) 0.40 0.46 0.42
Ore treated (t) 19,083,639 18,874,746 38,201,036
Concentrate produced (t) 261,128 230,500 446,718
Copper in concentrate (t) 67,289 59,687 116,698
Gold in concentrate (oz) 159,913 178,001 327,887
Gold in doré (oz) 11,626 14,355 28,129
Total gold (oz) 171,539 192,356 356,016
Australia - Ernest Henry      
Material mined (t) 1,061,384 7,308,491 11,350,039
Ore mined (t) 1,061,384 5,229,329 9,098,260
Copper head grade (%) 0.90 1.09 1.05
Gold head grade (g/t) 0.43 0.53 0.51
Ore treated (t) 3,200,415 5,357,887 10,360,819
Concentrate produced (t) 53,299 194,506 352,537
Copper in concentrate (t) 14,941 54,606 100,303
Gold in concentrate (oz) 17,979 69,068 128,701
Magnetite in concentrate (t) 264,409 - 498,975
Australia - Mount Isa      
Ore mined (t) 3,036,491 2,725,730 5,873,705
Copper head grade (%) 2.43 2.66 2.73
Ore treated (t) 3,027,273 2,736,942 5,882,967
Concentrate produced from ore (t) 273,889 272,363 609,865
Copper in concentrate from ore (t) 66,514 66,912 148,759
Anode copper (t) 89,351 110,029 237,667
Refined copper (t) 140,305 129,611 276,535
Canada - Kidd      
Ore mined (t) 1,169,017 1,251,940 2,227,223
Copper head grade (%) 1.55 1.87 1.97
Ore treated (t) 1,163,456 1,253,581 2,238,269
Concentrate produced (t) 67,887 83,790 162,758
Copper in concentrate (t) 17,329 22,244 42,322
Zinc concentrate produced (t) * 61,433 95,042 134,733
Zinc in concentrate (t) * 32,031 50,202 71,497
Canada – Horne      
Concentrate treated (t) 330,171 358,345 751,083
Anode copper (t) 89,221 88,588 187,410
Canada - CCR Refinery      
Refined copper (t) 133,442 126,829 263,967
Chile – Collahuasi**      
Material mined (t) 47,947,438 44,099,865 92,563,211
Ore mined (t) 10,458,676 10,218,655 19,905,585
Copper grade in ore milled (%) 0.79 1.03 1.02
Ore milled (t) 9,808,870 10,730,591 21,008,847
Concentrate produced (t) 216,806 352,694 675,749
Copper in concentrate (t) 55,875 95,258 183,604
Copper cathode (t) 8,085 7,899 15,841
Chile - Lomas Bayas      
Material mined (t) 31,999,220 31,019,058 66,900,909
ROM leach (t) 20,060,710 18,212,894 42,804,384
ROM copper grade (%) 0.23 0.25 0.26
Heap leach (t) 7,012,381 7,382,046 14,502,842
Heap leach copper grade (%) 0.37 0.37 0.37
Copper cathode (t) 36,606 37,143 73,605
Chile – Altonorte      
Concentrate treated (t) 471,572 516,889 1,033,956
Anode copper (t) 135,492 155,603 311,014
Peru - Antamina Copper***

 

   
Material mined (t) 30,283,896 25,253,048 53,255,990
Ore mined (t) 6,163,054 6,814,102 13,666,661
Copper head grade (%) 1.03 0.95 1.04
Ore treated (t) 7,579,304 6,257,746 12,688,078
Copper concentrate produced (t) 239,126 174,453 400,253
Copper in concentrate (t) 68,083 49,110 112,617
Peru – Tintaya      
Material mined (t) 33,423,523 50,248,745 100,725,107
Ore mined (t) 2,894,382 2,791,805 5,332,950
Ore milled (t) 3,545,383 3,638,139 7,378,509
Copper grade in ore milled (%) 0.65 1.03 1.22
Gold grade in ore milled (g/t) 0.13 0.21 0.23
Concentrate produced (t) 64,710 96,688 251,987
Copper in concentrate (t) 16,760 29,028 74,261
Gold in concentrate (oz) 7,621 13,741 33,144
Copper cathode (t) 3,130 12,159 20,969
Total mined copper production (t) (contained metal) 354,612 434,046 888,979
Total mined gold production (oz) (contained metal) 197,139 275,165 517,861
Total copper cathode (from own and third party material) (t) 321,568 313,641 650,917
Average LME copper cash price ($/t) 8,087 9,399 8,826
Average LBM gold price ($/oz) 1,651 1,444 1,573
* 100% consolidated figures 
** Xstrata Copper's pro-rata share of Collahuasi (44%)
*** Xstrata Copper's pro-rata share of Antamina (33.75

Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ


Teléfono/s
- 61 7 3295 7500
Rubros

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF