PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
SILVER STANDARD PROVIDES 2012 PRODUCTION RESULTS AND ISSUES 2013 PRODUCTION AND COST GUIDANCE
08/01/2013

VANCOUVER, Jan. 8, 2013 /PRNewswire/ - Silver Standard Resources Inc. (NASDAQ: SSRI, TSX: SSO) ("Silver Standard" or the "Company") announced 2012 production at the Pirquitas mine in Jujuy, Argentina and provided production and cost guidance for 2013.

2012 Operating Highlights:

-Exceeded silver production guidance: Produced 8.6 million ounces of silver in 2012, exceeding the high-end of the guidance range.  Produced 11.2 million pounds of zinc, near the high-end of 2012 guidance.

-Delivered strong operating performance:  Milled 4,433 tonnes per day, on average, during 2012, 11% above nominal design.  Silver recovery averaged 76% during 2012.

-Created value:  Drilled over 53,000 meters at Pirquitas during 2012, aggressively exploring the Cortaderas Breccia and Cortaderas Valley targets. Executed the Company's sales strategy, signing sales agreements with smelters, improving margins and building a strong customer base for 2013.

 

"In 2012, our team delivered on its commitments," said John Smith, President and CEO.  "At Pirquitas, we exceeded the high-end of our silver production guidance range, producing a record 8.6 million ounces and delivered on our sales strategy.  Exploration remains key to our business model, and we continue to focus on adding value through the drill bit.  In the fourth quarter, we completed the Pitarrilla Feasibility Study, defining a mine with approximately 480 million ounces of reserves and producing 15 million ounces of silver per year on average during the first 18 years of a 32-year project."

Summary of Mine Operating Statistics

    Q4 2012 Q3 2012 % Change
Total material mined Kt 4,415 4,333 1.9%
Ore processed Kt 417 404 3.2%
Silver mill feed grade g/t 212 214 (0.9%)
Zinc mill feed grade % 0.67 0.65 3.1%
Silver recovery % 79.9 77.7 2.8%
Zinc recovery % 42 39 7.7%
Silver produced '000 oz 2,268 2,163 4.9%
Zinc produced '000 lbs 3,176 2,770 14.7%
Silver ounces sold '000 oz 3,218 2,770 16.2%
Zinc pounds sold '000 lbs 2,731 2,152 26.9%

Note: Percent changes are calculated using rounded numbers presented in the table.

Mine Operations

During 2012, the Pirquitas mine produced a record 8.6 million ounces of silver.  The mine produced 2.3 million ounces of silver during the fourth quarter, 4.9% quarter-on-quarter improvement reflecting higher average silver recoveries in the plant and higher mill throughput.  The mine also produced 3.2 million pounds of zinc in the fourth quarter, bringing total zinc production to 11.2 million pounds for the year, near the high-end of the 2012 zinc production guidance range.

Approximately 417,000 tonnes of ore were milled at an average rate of 4,531 tonnes per day during the quarter, 13% above the plant's nominal design.  On an annual basis, the mill processed 4,433 tonnes per day during 2012.

Ore milled during the fourth quarter of 2012 contained an average silver grade of 212 g/t, in line with the 214 g/t reported for the third quarter. The average recovery rate for silver increased to 79.9% from 77.7% in the third quarter.

Outlook for 2013

Silver Standard's estimated production and cost guidance for 2013 are as follows:

-Produce and sell 8.2 to 8.5 million ounces of silver.

-Produce over 20 million pounds of zinc.

-Total cash cost of between $17.00 and $18.50 per silver ounce.

-Capital expenditures of $25 million at Pirquitas, including approximately $15 million for a tailings facility expansion but excluding capitalized stripping costs.

-Expenditures of $15 million for exploration across the Company's portfolio.

-Expenditures of $17 million for development.

Silver Standard plans to spend approximately $15 million on exploration in 2013.  Of this, approximately $7 million is budgeted for exploration at our Mexican projects, with the balance mainly budgeted for Argentina and Peru.  The Company may increase its exploration budget or redirect exploration spending in response to positive results.

The Company expects to spend a minimum of $17 million on development in 2013.  Of this, approximately $8 million and $7 million will be incurred at the Pitarrilla and San Luis projects, respectively, in line with our goal of advancing these projects to construction decisions.  Should construction decisions be made, development expenditures would increase significantly.  Planned investments in advance of construction decisions include optimization, land acquisition, community agreements, permitting and financing.        

John Smith, President and CEO of Silver Standard, commented on the Company's 2013 guidance, "Following a strong 2012, we continue to focus on delivering strong and predictable results at Pirquitas.  In the first half of the year we are moving from Phase 1 to Phase 2 of the San Miguel open-pit.  Due to ore and stockpile sequencing, we plan to produce approximately 2 million ounces of silver in the first quarter of 2013 with production strengthening as we move through the year.  At the same time, our team will continue with permitting, engineering and partnering activities at Pitarrilla. We remain focused on progressing towards a construction decision."

Silver Standard is required to adopt the accounting standard IFRIC 20 "Stripping Costs in the Production Phase of a Surface Mine" effective January 1, 2013.  The Company estimates that the adoption of IFRIC 20 will result in the capitalization of approximately $24 million of mining costs in 2013 that will be amortized in subsequent periods.

Changes to the Presentation of Non-GAAP Financial Measures

Commencing with its 2012 annual filings, Silver Standard plans to revise its non-GAAP "total cash cost" and "total production cost" disclosure methodology. Under the revised methodology, the Company will report total cash cost and total production cost on a "per payable ounce sold" basis, rather than on a per ounce produced basis as reported previously. Silver concentrate export duties that are being accrued but not paid will be reallocated to total cost to reflect their non-cash nature as the Company has an order in its favor against their payment.

Total cash cost will consist of the cost of inventory, third party smelting, refining and transportation and royalties less by-product credits.  Total production cost will consist of total cash cost plus depreciation, depletion, amortization (including amortization of deferred stripping costs) and silver concentrate export duties. The divisor for both measures is payable silver ounces sold in the period.

The 2013 total cash cost guidance incorporates these changes.

Technical Disclosure

The scientific and technical data contained in this news release has been reviewed and approved by Andrew W. Sharp, BEng, FAusIMM, a Qualified Person under National Instrument 43-101 who has consented to having his name included in this news release. Mr. Andrew W. Sharp has been employed by the Company as Vice President, Technical Services, since September, 2011.

On December 17, 2012, we filed a technical report entitled "NI 43-101 Technical Report on the Pitarrilla Project, Durango, State, Mexico" in accordance with the requirements of NI 43-101 and in support of a feasibility study for the Pitarrilla project.  A copy of the Technical Report is available under our profile on SEDAR at www.sedar.com.


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ

Silver Standard Resources es una compañía canadiense que se dedica a la exploración, desarrollo y producción de sus propiedades de recursos con predominio de plata. El enfoque de la minera está en optimizar la producción de plata en su mina Pirquitas en Argentina, y en avanzar otros proyectos de exploración y desarrollo, incluyendo Pitarrilla y San Agustín en México, el proyecto de oro y plata San Luis en Perú y Diablillo en Argentina.

Dirección/es
- Belgrano 575
Provincia
- Jujuy, Argentina