Goldrock Mines Corp. (the "Company") is pleased to announce that it has received the remaining assay results from the 8 outstanding holes of the 13 hole (2,983 metre) diamond drilling program on its Arizaro gold-copper porphyry discovery, located in Salta Province, Argentina. The Arizaro project is located immediately adjacent (3 km southeast) to the Company's feasibility stage, permitted Lindero oxide gold heap leach project. The Arizaro discovery exhibits a deeper oxide weathering profile than at Lindero.
The results in DDH ARD-24 (104 metres @ 0.89 g/t Au and 0.28% Cu) extends 65 metres to the north the high grade gold mineralization previously encountered (see news release dated Nov 1, 2011: Mansfield Expands Arizaro Porphyry Gold - Copper Discovery, Lindero Gold Project). In addition, DDH ARD--29 (16 metres @ 0.60 g/t Au) extends the high grade zone a further 50 metres to the south. See Figure 1.
The Company is pleased to report selected drill hole assay results from the remaining eight holes received including:
-0.89 g/t Au over 104 metres in hole ARD-24 (within 0.64 g/t Au over 160 metres) -0.80 g/t Au over 48 metres in hole ARD-27 (within 0.52 g/t Au over 116 metres) -0.61 g/t Au over 56 metres in hole ARD-28 (within 0.46 g/t Au over 118 metres) -0.60 g/t Au over 16 metres in hole ARD-29 (within 0.46 g/t Au over 56 metres).
| Drill Hole | From (metres) | To (metres) | Interval (metres) | Au (g/t) | Cu (%) |
|---|---|---|---|---|---|
| ARD-22 | 6 | 88 | 82 | 0.36 | 0.12 |
| ARD-23 | 32 | 74 | 42 | 0.35 | 0.22 |
| incl. | 42 | 66 | 24 | 0.43 | 0.23 |
| ARD-24 | 90 | 250 | 160 | 0.64 | 0.24 |
| incl. | 120 | 244 | 124 | 0.75 | 0.25 |
| incl. | 120 | 224 | 104 | 0.89 | 0.28 |
| incl. | 134 | 194 | 60 | 1.00 | 0.31 |
| ARD-25 | 110 | 172 | 62 | 0.25 | 0.16 |
| ARD-26 | 160 | 178 | 18 | 0.47 | 0.17 |
| ARD-27 | 20 | 136 | 116 | 0.52 | 0.19 |
| incl. | 26 | 74 | 48 | 0.80 | 0.28 |
| ARD-28 | 6 | 124 | 118 | 0.46 | 0.16 |
| incl. | 8 | 64 | 56 | 0.61 | 0.22 |
| ARD-29 | 8 | 64 | 56 | 0.46 | 0.16 |
| incl. | 42 | 58 | 16 | 0.60 | 0.30 |
The higher grade gold-copper intervals are commonly associated with a magnetite breccia. It is generally surrounded by a well fractured diorite porphyry unit with a well-defined quartz-chalcopyrite stockwork, hosting high to moderate gold-copper grades. As shown in Figure 2 and Figure 3, only a small portion (less than 15%) of the Arizaro porphyry system has been explored. The area explored to date as defined by drilling, surface sampling and mapped alteration covers 600 metres by 500 metres surface area.
Paul Matysek, CEO and President, commented "The results of the drilling program achieved management's objective of extending the high grade zone at Arizaro both to the north and to the south. The Company is now working for the release of a maiden NI 43-101 for the Arizaro project in the second quarter of 2013 and assessing the potential of the deposit to provide higher grade gold resources that could significantly extend the Lindero mine life and/or increase Lindero's annual production profile".
The Company, together with its consultants, has commenced preparing a NI 43-101 report for the deposit. This includes metallurgical testing of the typical medium to high grade mineralization at Arizaro at Kappes, Cassiday and Associates' Reno laboratory facilities to determine suitability for treatment at the planned adjacent Lindero gold heap leach processing facility.
ON BEHALF OF THE BOARD OF DIRECTORS,
"Paul Matysek"
Paul Matysek, M.Sc., P.Geo
President and CEO
Notes:
Arizaro Background
The Arizaro porphyry body was identified prior to the discovery of the Lindero gold deposit in 1999. The Arizaro porphyry system, as defined by drilling, surface sampling and mapped alteration covers a 600 metre by 500 metre surface area. Gold-copper mineralization occurs from surface to a true vertical depth of 300 metres and remains open for expansion in all directions. The Company initially tested the discovery with 16 diamond drill holes, all of which had significant mineralized intercepts with numerous thick sections greater than 100 meters with grades greater than 0.30 g/t gold and 0.15% copper, and with one hole returning 48 meters of 1.38 g/t gold and 0.36% copper.
Qualified Person
David Keough, FAusIMM(CP), COO and a director of Goldrock Mines Corp., is a "qualified person" as such term is defined in National Instrument 43-101 (Standards of Disclosure for Mineral Projects) and has reviewed and approved the technical information and data included in this press release.
About Goldrock Mines Corp.
Goldrock Mines Corp. (the "Company") previously Mansfield Minerals Inc. (TSX-V: MDR) commenced trading on the Exchange under the new trading symbol TSX-V:GRM on January 21, 2013. The share capital of the Company remains unchanged. The Company recently enhanced its management team and, under the new Goldrock banner, is pursuing a long-term objective to become an annual 250,000 ounce gold producer, both organically through the development of its existing properties and by the acquisition of near-term production assets through purchase or merger.
Goldrock is a Canadian-based explorer and developer focusing on the development of its 100% owned Lindero gold deposit and the exploration of the adjacent Arizaro gold-copper porphyry prospect located within the Lindero project in Salta province, northwestern Argentina. A feasibility study on the Lindero deposit has been commissioned with completion anticipated in Q1/2013. This final feasibility study will be based on a heap leach gold mine operating at approximately 15,000 tpd using a higher cut-off grade of 0.4 grams/tonne Au, increasing average grades early in the production schedule and lowering initial capital requirements. Different production options are being assessed from a standard 10 year life of mine production plan to more selective mining approaches that would allow for initial processing of higher grade ore at reduced throughput, to reduce initial capital cost, followed by scaling up of the operation utilizing the early project cash flow.