PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
GOLDROCK ESTABLISHES TECHNICAL ADVISORY COMMITTEE LINDERO GOLD DEPOSIT - PRE PRODUCTION GROUP - ARGENTINA
28/02/2013

Goldrock Mines Corp. ("Goldrock" or the "Company") is pleased to announce the establishment of a Technical Advisory Committee which will comprise a select group of highly skilled and experienced consultants who will assist the Company in advancing the development of its 100% owned Lindero heap leach gold project, located in northwestern Argentina. The Company also announces the appointment of the initial consultants to the Technical Advisory Comittee.

Paul Matysek, CEO and President, comments as follows: "On behalf of the board of directors, I am delighted that Michael Hoffman, Dean Mussatti and David Guerrero have joined Goldrock's technical team. Their hands-on experience and knowledge in heap leach operations, metallurgy and logistics will help ensure that Goldrock successfully transitions from an exploration company to a mining operation."

Michael Hoffman is a professional mining engineer with over 30 years experience as a CEO and senior mining executive for both junior and senior mining companies. Mike has extensive experience in mine feasibility, development and operations. He has worked as a senior executive for companies such as Yamana, Goldcorp, Desert Sun and Belo Sun and served as CEO of Kria Resources and is on the board of directors of Trevali Mining. He received his Bachelor of Applied Science in Mining Engineering from Queen's University.

Dean Mussatti's career has spanned over 25 years in the gold mining business and includes an extensive background in mining, metallurgy and geotechnical aspects of heap leach and milling projects in North and South America. He has participated in the design, construction and operation of over twenty gold projects. He has extensive heap leach pad construction experience with specialties in large scale clay/geosynthetic liner installations. Dean's metallurgical focus is on gold leach kinetics with recent work on improving overall recovery for both run of mine and crushed ore leach facilities. He also consults to various gold companies on cost control and optimization of leach pad projects both on capital and operation phases. Dean's educational background includes degrees in Mining and Metallurgical Engineering and he has published papers on gold leach kinetics and soil liner construction.

David Guerrero has over 10 years experience in the mining industry providing a variety of integrated logistical solutions to overcome the challenges of remotely located mining operations. David currently services a number of exploration and development companies working in northwestern Argentina. He is the Vice President of the Salta Mining Providers Chamber and works actively in numerous regional infrastructure mining commissions, developing and coordinating private and public sector initiatives.

ON BEHALF OF THE BOARD OF DIRECTORS,

"Paul Matysek"

Paul Matysek, M.Sc., P.Geo
President and CEO

For additional information
(604) 681-4462 www.goldrockmines.com

About Goldrock Mines Corp.

Goldrock Mines Corp. (the "Company") recently enhanced its management team and is pursuing a long-term objective to become an annual 250,000 ounce gold producer, both organically through the development of its existing properties and by the acquisition of near-term production assets through purchase or merger.

Goldrock is a Canadian-based explorer and developer focusing on the development of its 100% owned Lindero gold deposit and the exploration of the adjacent Arizaro gold-copper porphyry prospect located within the Lindero project in Salta province, northwestern Argentina. A feasibility study on the Lindero deposit has been commissioned with completion anticipated in Q1/2013. The feasibility study is based on a heap leach gold mine operating at approximately 15,000 tpd using a higher cut-off grade (0.35 to 0.4 g/t Au). Different production options are being assessed from a standard 10 year life of mine production plan to more selective mining approaches that would allow for initial processing of higher grade ore at reduced throughput, to reduce initial capital cost, followed by scaling up of the operation utilizing the early project cash flow.

The Company has retained Kappes, Cassiday and Associates (Reno) as lead consultant in collaboration with AMEC Americas Limited, and Mine Development Associates (Reno) to produce the full feasibility study.

The current NI 43-101 reported Measured and Indicated resources (at a 0.4 grams/tonne Au cut-off) for the Lindero deposit is 71.9 million tonnes grading 0.74 grams/tonne Au, containing 1.71 million ounces of gold. (see news release dated March 22, 2010).

The Company has been granted the primary mining permit (Declaracion de Impacto Ambiental) by the Salta provincial government allowing the Company to develop the Lindero open pit, heap leach gold mine.


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Teléfono/s
- (604) 681-4462 Fax: (604) 681-0180
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF