Troy Resources Limited ("Troy") (TSX:TRY)(ASX:TRY) is pleased to announce new drill results for the "Inca Gap" at its wholly owned Casposo gold and silver mine in Argentina. The best drill result was CA-13-543 and included 1.10m at 198.01g/t gold and 18,670g/t silver or 509.17g/t Au_Eq from 278.00m.
Commenting on the results Troy CEO Paul Benson said: "These drilling results are particularly pleasing on a number of levels. Obviously there are some very high grades, but more importantly these holes are filling a gap between the Inca 1 and Inca 2 blocks that are already in underground Reserves and are in an area where tunnel development was already planned and thus easy to access. At this stage we expect to add this material to Reserves and Resources later in the year."
"The holes were collared in the hangingwall and also tested the mineralised structure called B-Vein before hitting the INCA structure thus allowing us to continue to define this hangingwall zone. B-vein is currently being mined in the open cut, but to date none of the underground mineralisation has been included in Reserves. Again we now expect to include the underground B-Vein in a Reserve and Resources update later in the year."
In early January 2013, a review of the INCA 1 - INCA 2 Underground Resource identified a 60m-80m drilling gap between the INCA 1 Reserve and the INCA 2 Reserve in the vicinity of post mineral dyke 2. Given that the total strike length of the INCA 2 Reserve is about 240m this 60m-80m drilling gap was highlighted as a priority drill target.
In February 2013, drilling commenced with five holes completed to date. Four of the five holes hit the INCA structure and encountered the quartz vein at the planned target depth. The fifth hole hit the post mineral rhyolite dyke. All of these holes also targeted the B Vein structure in the hangingwall of the INCA Vein.
To view Table 1, a longitudinal cross section of INCA Vein Gap Target and an image of a Significant Vein Intercept, please visit the following link: http://media3.marketwire.com/docs/TRY324T.pdf.
Significant assay intervals received to date include.
INCA VEIN ZONE:
B VEIN HANGINGWALL ZONE:
The best of the new holes was CA-13-543 drilled to a final depth of 342.80m; mineralised interval as follows;
Drilling is continuing. All of the recent results will be included in an updated Reserve and Resource update expected later in calendar 2013.
Information of a scientific or technical nature that which relates to exploration results, Mineral Resources or ore Reserves was prepared under the supervision of Peter J. Doyle, Vice President Exploration and Business Development of Troy, a "qualified person" under National Instrument 43 101 - "Standards of Disclosure for Mineral Projects", a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Doyle has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a "competent person" as defined under the Australian JORC Code as per the 2004 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Doyle has reviewed and approved the information contained in this announcement. Mr Doyle is: