PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
SILVER STANDARD PROVIDES Q1 2013 OPERATIONAL RESULTS
11/04/2013

VANCOUVER, April 11, 2013 /PRNewswire/ - Silver Standard Resources Inc. (TSX: SSO), (NASDAQ: SSRI) ("Silver Standard" or the "Company") provided a Q1 2013 operational update for its Pirquitas mine in Jujuy, Argentina and for other corporate activities.

First Quarter 2013 Highlights:

 

-Delivered predictable production:  Produced 2.0 million ounces of silver, in line with plan for the quarter.

-Completed Phase 1 of the San Miguel open pit:  Progressed mining operations in Phase 2 of the San Miguel open pit, positioning the Company to process higher grade material in the second half of 2013.

-Delivered strong operating performance:  Milled 4,402 tonnes per day, on average, 10% above nominal design.  Recovered 76% of the silver processed. 

"In the first quarter of 2013, we delivered to plan as we did throughout 2012," said John Smith, President and CEO.  "At Pirquitas, we produced 2 million ounces of silver, a great result given that we are transitioning the pit to Phase 2.  We also took advantage of the strong debt markets and raised $265 million through a convertible bond, strengthening our balance sheet even after repaying the existing convertible note.  It was a successful quarter for Silver Standard."

Summary of Mine Operating Statistics

    Q1 2013 Q4 2012 % Change
Total material mined Kt 4,210 4,415 (4.6%)
Ore milled Kt 396 417 (5.0%)
Silver mill feed grade g/t 207 212 (2.4%)
Zinc mill feed grade % 0.92 0.67 37.3%
Silver recovery % 76.3 79.9 (4.5%)
Zinc recovery (zinc concentrate) % 41 42 (2.4%)
Silver produced '000 oz 2,017 2,268 (11.1%)
Zinc produced (zinc concentrate) '000 lbs 3,323 2,615 27.1%
Silver sold '000 oz 2,018 3,218 (37.3%)
Zinc sold '000 lbs 2,147 2,731 (21.4%)

Note: Percent changes are calculated using the rounded numbers presented above.

 

Mine Operations

The Pirquitas mine produced 2.0 million ounces of silver during the first quarter of 2013, in line with guidance for the quarter but down from the 2.3 million ounces produced in the fourth quarter of 2012.  The sequential decline in silver production reflects lower tonnage through the mill and lower recoveries in the plant.  The mine also produced 3.3 million pounds of zinc in the first quarter, a 27.1% improvement, reflecting higher zinc grades as the Company mined more of the zinc-rich Potosi area of the San Miguel open pit.  The Company sold approximately 2.0 million ounces of silver during the quarter, in line with guidance.

Approximately 396,000 tonnes of ore was milled during the first quarter of 2013, down from 417,000 tonnes last quarter mostly due to fewer operating days in a shorter reporting period.  Ore was milled at an average rate of 4,402 tonnes per day during the first quarter, 10% above the plant's nominal design and in line with the production plan.  The average recovery rate for silver decreased to 76.3% from 79.9% last quarter, mainly due to more oxidized and transitional ore in the mill feed.  As Phase 2 of the San Miguel open pit deepens, the proportion of oxide and transitional ore in the mill feed is expected to decrease.

First Quarter Earnings Release:

The Company plans to issue its first quarter earnings release on Wednesday, May 8, 2013 after markets close.

Qualified Person:

The scientific and technical data contained in this news release has been reviewed and approved by the following Qualified Person ("QP") under National Instrument 43-101, who consents to having his name included in this news release.

  • Andrew W. Sharp, BEng., FAusIMM: Mr. Andrew W. Sharp, who has been employed by the Company as Vice President of Technical Services since September 2011, is the Qualified Person responsible for the technical content of this news release.

For further information contact:
Investor Relations
N.A toll-free: (888) 338-0046
All others: (604) 484-8216
E-Mail: invest@silverstandard.com

SOURCE Silver Standard Resources Inc.

 


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ

Silver Standard Resources es una compañía canadiense que se dedica a la exploración, desarrollo y producción de sus propiedades de recursos con predominio de plata. El enfoque de la minera está en optimizar la producción de plata en su mina Pirquitas en Argentina, y en avanzar otros proyectos de exploración y desarrollo, incluyendo Pitarrilla y San Agustín en México, el proyecto de oro y plata San Luis en Perú y Diablillo en Argentina.

Dirección/es
- Belgrano 575
Provincia
- Jujuy, Argentina
Teléfono/s
- (54 388) 422-2288 / 422-2279
Rubros
- Compañía Minera

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF