PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
COEUR REPORTS STEADY FIRST QUARTER PRODUCTION AND REAFFIRMS FULL-YEAR PRODUCTION GUIDANCE
15/04/2013

Coeur d'Alene, Idaho - April 15, 2013 - Coeur d'Alene Mines Corporation (the “Company” or “Coeur”) (NYSE: CDE, TSX: CDM) announced it produced 3.8 million ounces of silver and 56,913 ounces of gold during the first quarter of 2013.  The Company also reaffirmed its full year production guidance of 18.0-19.5 million ounces of silver and 250,000-265,000 ounces of gold in 2013.  Coeur will report its full operating and financial results on May 9, 2013.

First Quarter Operating Highlights

-Companywide silver production of 3.8 million ounces was 22% lower than the first quarter 2012 due to lower grade ore processed from both open pit and underground operations at the Company's Palmarejo mine.

-Companywide gold production of 56,913 ounces was 30% higher than the first quarter 2012 due to significantly higher production from the Company's Kensington and Rochester mines.

-Metal sales were $178.6 million, down 13% compared with the first quarter 2012.

-Average realized silver and gold prices were $30.61 per ounce and $1,630 per ounce, respectively, representing decreases of 6% and 4%, respectively, compared with the first quarter of 2012.

-Grades and mining rates rebounded at Palmarejo late in the first quarter compared to the third and fourth quarters of 2012. Palmarejo produced 1.6 million ounces of silver and 22,965 ounces of gold in the first quarter 2013. While lower than first quarter 2012 levels, silver and gold production was 6% and 15% higher, respectively, compared to the fourth quarter 2012.  Production rates are expected to climb in the second half of 2013.

-San Bartolomé produced 1.4 million ounces of silver, which was 12% lower than the first quarter of 2012 due to lower silver grades, but the mine performed better than planned and this level should reflect anticipated production rates during the remainder of the year.

-Rochester's production was temporarily affected by extremely cold temperatures and heavier than normal snowfall during January and February, which impacted ore crushing. Rochester produced 0.6 million ounces of silver and 8,742 ounces of gold, which was lower than production in the fourth quarter 2012, but 47% and 65% higher than the first quarter 2012, respectively.

-Kensington's gold production more than tripled compared to the first quarter of 2012, reaching 25,206 ounces.  Kensington's production is expected to increase in the second half of 2013 over the first half of 2013 due to anticipated improved grades and higher throughput rates.

Table 1: Operational Highlights: Production

(silver ounces in thousands)

1Q 2013

 

1Q 2012

 

Quarter Variance

 
 

Silver

Gold

Silver

Gold

Silver

Gold

Palmarejo

1,646

 

22,965

 

2,483

 

31,081

 

(34

%)

(26

%)

San Bartolomé

1,391

 

—

 

1,591

 

—

 

(13

%)

n.a.

Rochester

648

 

8,742

 

441

 

5,292

 

47

%

65

%

Martha(1)

—

 

—

 

123

 

84

 

n.a.

n.a.

Kensington

—

 

25,206

 

—

 

7,444

 

n.a.

239

%

Endeavor

150

 

—

 

248

 

—

 

(40

%)

n.a.

Total

3,835

 

56,913

 

4,886

 

43,901

 

(22

%)

30

%

  1. The Martha mine in Argentina ceased production at the end of the third quarter 2012.

2013 Outlook

In addition to its unchanged 2013 production outlook provided in Table 2 below, Coeur reiterated its full-year 2013 projected cash operating costs1 of $8.00 - $9.00 per silver ounce, assuming a gold by-product price of $1,650 per ounce.  Kensington's cash operating costs1 are estimated at $900 - $950 per gold ounce for 2013.

  1. Cash operating costs are non-GAAP measures. 

Table 2: 2013 Production Outlook

(silver ounces in thousands)

Country

Silver

Gold

Palmarejo

Mexico

7,700-8,300

98,000-105,000

San Bartolomé

Bolivia

5,300-5,700

—

Rochester

Nevada, USA

4,500-4,900

44,000-46,000

Endeavor

Australia

500-600

—

Kensington

Alaska, USA

—

108,000-114,000

Total

 

18,000-19,500

250,000-265,000

About Coeur

Coeur d'Alene Mines Corporation is the largest U.S.-based primary silver producer and a growing gold producer. The Company has four precious metals mines in the Americas generating strong production, sales and cash flow in continued robust metals markets. Coeur produces from its wholly owned operations: the Palmarejo silver-gold mine in Mexico, the San Bartolomé silver mine in Bolivia, the Rochester silver-gold mine in Nevada and the Kensington gold mine in Alaska. The Company also has a non-operating interest in a mine in Australia. The Company also conducts ongoing exploration activities in Mexico, Argentina, Nevada, Alaska and Bolivia. In addition, the Company owns strategic investment positions in eight silver and gold development companies with projects in North and South America.

For Additional Information:

Wendy Yang, Vice President, Investor Relations

(208) 665-0345

Stefany Bales, Director, Corporate Communications

(208) 667-8263

www.coeur.com


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Teléfono/s
- (208) 667-3511
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF