PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
GOLDCORP REPORTS 2013 FIRST QUARTER RESULTS; ANNUAL GUIDANCE RECONFIRMED
02/05/2013

VANCOUVER, May 2, 2013 /CNW/ - GOLDCORP INC. (TSX: G, NYSE: GG) today reported quarterly revenues of $1.0 billion, generating adjusted net earnings1,2 of $253 million, or $0.31 per share, compared to $404 million, or $0.50 per share, in the first quarter of 2012.  Reported net earnings were $309 million compared to $479 million in the first quarter of 2012.  Adjusted operating cash flow1,3 was $400 million.

First Quarter 2013 Highlights

· Revenues totaled $1.0 billion.

· Gold sales totaled 595,100 ounces1.

· All-in sustaining costs totaled $1,1351,4 per ounce, $565 per ounce on a by-product basis and $710 per ounce on a co-product basis1,5.

· Adjusted operating cash flow totaled $400 million or $0.49 per share.

· Adjusted net earnings were $253 million, or $0.31 per share.

· Dividends paid amounted to $122 million.

· Issued $1.5 billion in senior unsecured notes.

· Commercial production declared at Pueblo Viejo.

"Our mines performed as planned during the first quarter to provide a good start to 2013," said Chuck Jeannes, Goldcorp President and Chief Executive Officer. "As previously reported, we expect gold production to increase throughout the year with a corresponding decrease in operating costs as we work through planned lower grades at Peñasquito and Alumbrera, and benefit from the ramp up of production at Pueblo Viejo. Based on this start, we remain quite comfortable with our annual guidance for both gold production and operating costs.

Production at Peñasquito in Mexico was in line with expectations and grade reconciliation continues to be very strong. We expect grades at Peñasquito to increase over the balance of 2013 resulting in higher production as mining progresses deeper into the Peñasco pit phase 4A.  Red Lake in Ontario had an excellent quarter, with a good performance in the High Grade Zone leading to strong gold production.

"I believe the long term fundamentals supporting a strong gold price remain firmly in place, but in light of recent volatility in gold and other metals prices we have completed a review of capital spending, exploration and general and administrative costs. A contingency plan is now in place that would defer spending should market conditions warrant; however, Goldcorp's strong cash flows, very low debt and over $4 billion of liquidity6 have positioned the Company for success in any conceivable metals price environment. Our next generation of gold projects under construction, including Cerro Negro in Argentina, Éléonore in Quebec and Cochenour in Ontario, are expected to deliver high-margin, low-cost growth over the next five years with over half of the capital spending related to these projects to be completed by the end of this year. We remain comfortable with guidance of $2.8 billion in capital spending for the year, and our shareholders can count on continued discipline as we advance our growth strategy and focus on execution and prudent cost management at our mines and projects."

Financial Review

Gold sales in the first quarter were 595,100 ounces on production of 614,600 ounces.  This compares to sales of 545,700 ounces on production of 524,700 ounces in the first quarter of 2012. Silver production totaled 5.6 million ounces compared to silver production of 6.6 million ounces in the prior year's first quarter.  Operating costs were $1,135 per ounce of gold on an all-in sustaining cost basis, $565 per ounce on a by-product basis and $710 on a co-product basis.

Net earnings in the quarter were $309 million compared to $479 million in the first quarter of 2012. Adjusted net earnings in the first quarter totaled $253 million, or $0.31 per share, compared to $404 million or $0.50 per share, in the first quarter of 2012.  Adjusted net earnings in the first quarter of 2013 primarily exclude the gains from the foreign exchange translation of deferred income tax liabilities, and mark-to-market gains on the conversion feature of convertible senior notes, but include the impact of non-cash stock-based compensation expenses which amounted to approximately $18 million or $0.02 per share for the quarter.  Adjusted operating cash flow was $400 million compared to $480 million in last year's first quarter.  The average realized gold price for the quarter was $1,6221 per ounce of gold sold during the quarter compared to $1,707 per ounce during the year-ago quarter. 

Mexico

At Peñasquito, production totaled 60,100 gold ounces at total cash costs of $611 per ounce.  As previously reported, mining in the first half of 2013 is taking place in a lower grade portion of the pit.  Process plant throughput in the quarter averaged 103,660 tonnes per day.  As metals grades increase, production is expected to accelerate and costs are forecast to decrease significantly in the second half of the year.

Ongoing studies to develop a long-term water strategy for the Peñasquito district continue to progress.  A new water source has been identified within the Company's current permitted basin with the potential to supply sufficient fresh water to continue the plant ramp-up to full design capacity.    The analysis of the development of a new well field in this location is expected to be completed in the second quarter.  Current water availability is expected to be sufficient to achieve guidance of between 360,000 and 400,000 ounces for 2013.

Seven drills at Peñasquito are completing wide-spaced testing of the deep skarn potential between and below the Peñasco and Chile Colorado deposits. Recent results continue to demonstrate the presence of copper, gold, silver and zinc mineralization over significant widths within skarn alteration.

Gold production at Los Filos was 81,500 ounces in the first quarter at a total cash cost of $589 per ounce.  The construction of the next expansion phase of the Los Filos heap leach pad facility is progressing well and expected to be completed late in the second quarter of 2013 as planned. With proven and probable gold reserves at Los Filos increasing to 7.43 million ounces (296.71Mt at @ 7.43g/t Au) in 2012, a study is underway to investigate the potential of expanding the long-term production profile at Los Filos. The study is expected to be completed by the end of 2013.

Canada

At Red Lake in Ontario, gold production for the first quarter was 145,500 ounces at a total cash cost of $476 per ounce.   The strong quarterly performance was driven by an increased number of available high grade mine headings.  Exploration drilling at Red Lake continued to focus on the newly-discovered NXT zone adjacent to the High Grade Zone with the objective of growing the existing gold resource and converting resources to reserves.  Results to date indicate that the zone remains open to the west and in both directions vertically.  Several drills are targeting this zone both from the 4199 exploration drift and from existing infrastructure at higher levels in the mine.  Exploration development from the newly-completed drift at the 47 level is expected to provide closer drill access to this zone.

At Porcupine in Ontario, gold production in the first quarter totaled 67,200 ounces at a total cash cost of $797 per ounce. The Hoyle Pond Deep project continued to advance, which will access deeper discovered zones of gold mineralization and enhance operational flexibility and efficiencies throughout the Hoyle Pond underground complex.

Central America

At Pueblo Viejo, first quarter gold production totaled 64,700 ounces at a total cash cost of $472 per ounce.  Production was lower than expected due primarily to lower ore tonnes processed due to issues with certain components during start-up that were largely resolved by the end of the first quarter.  Ramp-up is expected to continue during the first half of 2013 to full capacity, with 2013 production expected to be between 330,000 to 435,000 ounces.

Overall construction of the 215 MW dual fuel power plant is 80% complete, with commissioning expected by the end of the third quarter of 2013.  Commissioning activities related to the copper circuit continued during the quarter and first copper production is expected during the third quarter of 2013.

The government of the Dominican Republic has asked Barrick on behalf of the Pueblo Viejo joint venture to accelerate and increase the benefits that the Dominican Republic will derive from the mine.  Barrick, while reserving rights under the Special Lease Agreement (SLA), continues to engage in dialogue with the government in an effort to achieve a mutually acceptable outcome.  To date, the outcome of the dialogue is uncertain but any amendments to the SLA would likely result in significant additional and accelerated payments to the government.

Advancing the Growth Drivers

Construction of the Cerro Negro project in Argentina continued to advance steadily in the first quarter.  The permit for the construction of the power line to connect to the grid was received during the quarter but later than previously expected.  The delay may affect the mobilization of the contractor that will construct the power line and increases the potential for initial gold production to be deferred until the first quarter of 2014.

Engineering, Procurement and Construction Management (EPCM) activities at Cerro Negro are progressing with detailed engineering 92% complete and EPCM total progress at approximately 62%. 

The Eureka vein deposit will provide the first ore to the mill and initial stope production has commenced. The stockpile contains an estimated 51,320 tonnes at a grade of 11.69 grams per tonne of gold and 220 grams per tonne of silver, and continues to reconcile well with reserve estimates.  The Eureka decline has now reached a length of 2,305 metres of the approximately 3,900 metres planned.  Development of the Mariana Norte and Mariana Central veins is also progressing well, with scheduled ore development to commence in the second and third quarters, respectively.

An extensive surface geological mapping and sampling program over the various Cerro Negro concessions continued in the first quarter.  The program has identified a number of new targets that will be drill-tested for the first time throughout 2013.  Current exploration drilling is focused on new gold reserves near existing veins.

Éléonore in Quebec remains on track to produce first gold in late 2014.  The exploration ramp has now reached 2,940 metres in length which corresponds to a vertical depth of nearly 470 metres below surface.  The production shaft has now reached a depth of 220 metres, in line with plan.  Conversion of the exploration shaft from sinking to operating mode was successfully completed which has allowed off-shaft development on the 650 metre level to commence.

Exploration during the quarter focused on in-fill drilling in the upper mine area.  A total of 18,884 metres of diamond drilling was completed from strategic working platforms in the exploration ramp.  Currently six diamond drills are conducting definition and exploration drilling.

At the Cochenour project in the Red Lake district, the haulage drift has now advanced to 71% completion with expected completion in the fourth quarter of 2013.  Two drills continue to work in the haulage drift to test the potential of the underexplored area.  Underground exploration diamond drilling of the Bruce Channel Deposit will commence later in the year once the haulage drift reaches a sufficient extent and drilling platforms are excavated.

Exploration activities resumed late in the quarter at the Camino Rojo project near Peñasquito with six core drills completing 2,026 metres in six in-fill holes into the sulfide deposit in the West Extension.  Drilling resumed following the successful signing of an agreement with the Ejido San Tiburcio covering 2,500 hectares of land providing long-term surface rights that enable mining at Camino Rojo.  In addition, a five-year exploration agreement was signed that provides permission to explore and drill on another 2,500 hectares of ejido land within the Camino Rojo concession.

2013 Guidance Outlook

The Company today reconfirmed guidance for 2013 of between 2.55 and 2.80 million ounces at total cash costs of between $1,000 and $1,100 per ounce on an all-in sustaining cost basis; $525 to $575 per ounce of gold on a by-product basis and $700 to $750 per ounce on a co-product basis. Capital spending guidance of $2.8 billion for 2013 has also been reconfirmed.

Goldcorp is one of the world's fastest growing senior gold producers. Its low-cost gold production is located in safe jurisdictions in the Americas and remains 100% unhedged.

This release should be read in conjunction with Goldcorp's first quarter 2013 interim consolidated financial statements and MD&A report on the Company's website, in the "Investor Resources - Reports & Filings" section under "Quarterly Reports".

A conference call will be held on May 2, 2013 at 10:00 a.m. (PDT) to discuss the first quarter results. Participants may join the call by dialing toll free 1-800-355-4959 or 1-416-695-6617 for calls from outside Canada and the US.  A recorded playback of the call can be accessed after the event until June 2, 2013 by dialing 1-800-408-3053 or 1-905-694-9451 for calls outside Canada and the US.  Pass code: 5331726.  A live and archived audio webcast will also be available at www.goldcorp.com.

(1) The Company has included non-GAAP performance measures on an attributable basis throughout this document.  Attributable performance measures include the Company's mining operations and projects and the Company's share from Alumbrera and Pueblo Viejo. The Company believes that disclosing certain performance measures on an attributable basis is a more accurate measurement of the Company's operating and economic performance and reflects the Company's view of its core mining operations. The Company believes that, in addition to conventional measures prepared in accordance with GAAP, the Company and certain investors use this information to evaluate the Company's performance and ability to generate cash flow. However these performance measures do not have any standardized meaning. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP.
   
(2)  Adjusted net earnings and adjusted net earnings per share are non-GAAP performance measures. The Company believes that, in addition to conventional measures prepared in accordance with GAAP, the Company and certain investors use this information to evaluate the Company's performance. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. Refer to page 42 of the Q1 2013 Management Discussion & Analysis ("MD&A") for a reconciliation of adjusted net earnings to reported net earnings attributable to shareholders of Goldcorp.
   
(3)  Adjusted operating cash flows and adjusted operating cash flows per share are non-GAAP performance measures which the Company believes provides additional information about the Company's ability to generate cash flows from its mining operations. Refer to page 43 of the Q1 2013 MD&A for a reconciliation of adjusted operating cash flows to reported net cash provided by operating activities.
   
(4)  For 2013, the Company is adopting an "all-in sustaining cost" non-GAAP performance measure that the Company believes more fully defines the total costs associated with producing gold. All-in sustaining costs include by-product cash costs, sustaining capital expenditures, corporate administrative expense, exploration and evaluation costs and reclamation cost accretion. As the measure seeks to reflect the full cost of gold production from current operations, new project capital is not included in the calculation. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. The Company reports this measure on a sales basis. Refer to page 41 of the Q1 2013 MD&A for a reconciliation of all-in sustaining costs.
   
(5)  The Company has included non-GAAP performance measures - total cash costs, by-product and co-product, per gold ounce, throughout this document. The Company reports total cash costs on a sales basis. In the gold mining industry, this is a common performance measure but does not have any standardized meaning. The Company follows the recommendations of the Gold Institute Production Cost Standard. The Company believes that, in addition to conventional measures prepared in accordance with GAAP, the Company and certain investors use this information to evaluate the Company's performance and ability to generate cash flow. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. Total cash costs on a by-product basis are calculated by deducting Goldcorp's share of by-product silver, copper, lead and zinc sales revenues from Goldcorp's share of production costs.    
  Total cash costs on a co-product basis are calculated by allocating Goldcorp's share of production costs to each co-product based on the ratio of actual sales volumes multiplied by budget metal prices as compared to realized sales prices. The budget metal prices used in the calculation of co-product total cash costs were as follows:
      2013     2012     2011
Gold          $1,600     $1,600      $1,250
Silver           34.00     34.00     20.00
Copper               3.50      3.50     3.25
Lead                      0.90     0.90     0.90
Zinc               0.90     0.90     0.90
  Refer to page 40 of the MD&A for a reconciliation of total cash costs to reported production costs.
   
(6) At March 31, 2013 the Company held $1,463 of cash and cash equivalents, $551 of money market investments and held an undrawn $2 billion revolving credit facility.

Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ

Newmont es la empresa de oro líder en el mundo y un productor de cobre, plata, zinc y plomo. La cartera de activos, perspectivas y talento de clase mundial de la compañía está anclada en jurisdicciones mineras favorables en América del Norte, América del Sur, Australia y Africa.

Newmont es el único productor de oro que figura en el índice S&P 500 y es ampliamente reconocido por sus prácticas ambientales, sociales y de gobierno corporativo.

Newmont es líder de la industria en creación de valor, respaldada por sólidos estándares de seguridad, ejecución superior y competencia técnica.  Newmont fue fundada en 1921 y ha sido comercializada en bolsa desde 1925. 

 

 

Dirección/es
- Av. San Martín 1207, Perito Moreno
Provincia
- Santa Cruz, Argentina
Teléfono/s
- (54 11) 5438 0000
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF