PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
OROCOBRE PROVIDES OLAROZ LITHIUM PROJECT CONSTRUCTION UPDATE
28/05/2013

BRISBANE, AUSTRALIA--(Marketwired - May 28, 2013) - Orocobre Limited (TSX:ORL)(ASX:ORE) ("Orocobre" or "the Company") is pleased to provide a progress report on the construction of the Company's flagship Olaroz lithium project.

The construction of the Olaroz lithium project continues to progress on time and within budget.

To view Image 1, please visit the following link: http://media3.marketwire.com/docs/orl529-F1.pdf.

Over the past month the following tasks have been completed:

  • Liming plant ground works and foundations.
  • Raw water pipeline.
  • Road and platforms on the salar.

The following tasks are in progress or commenced in May:

  • Foundations and metal structure fabrication for process plant buildings, soda ash warehouse, finished product warehouse and maintenance facilities.
  • Raw water pumping station - Electrical control room installation.
  • Preparation for overhead power line construction in Area 4000-7000-8000.
  • Ground work and concrete foundations of water treatment plant.
  • Waste water treatment plant 2nd stage.
  • Mechanical erection of liming plant.
  • Brine Wells - drilling.
  • Brine pipeline - installation.
  • Site surveillance - access control.
  • Evaporation pond construction.
  • Vegetation removal and manual site clearance.
  • Ground work and concrete foundations for liming plant.
  • Liming plant structure - fabrication.
  • Ground work and concrete foundations for water plant.
  • Water plant tank construction.
  • Gas pipeline construction.
  • Definitive camp (supply and erection).
  • Definitive camp infrastructure construction.
  • Overflow channel construction.
  • Concrete supply on site.
  • Camp infrastructure (Sewage, water and power lines).

The following tasks are scheduled to begin in June and July:

  • Construction of process buildings (main building, soda ash and end product storage).
  • Liner installation at evaporation ponds.
  • Construction of reinforced earth gabions for transfer pumps foundations.
  • Construction of overhead power line - LMT Area 4000-7300-8000.
  • Construction of warehouse and maintenance workshop building.

Approximately $101m of the US$229m capital budget has been committed or spent (up from $87m last month) and all major contracts awarded to this point remain on, or under, budget. The process of tendering and awarding contracts is on schedule.

The Company continues to follow the "Jujuy First" strategy to successfully work with suppliers and the employment bureau to focus on the hiring of local people from the communities of Olaroz, Huancar, Puesto Sey, Pastos Chicos, Catua, Susques, Jama, El Toro, Coranzulí, San Juan and Abrapampa. The engagement of the community also extends to the provision of health services and programs to encourage the continued education of young people.

The project implementation is through EPCM (Engineering, Procurement and Construction Management) with a high proportion of local involvement through construction and supply contracts and local employment. The unique community and shared value policy continues as a key success factor, training local people with supervision by high quality experienced professionals.

The Olaroz lithium project is being developed by Orocobre (66.5%) with partners Toyota Tsusho Corporation ("TTC") (25%) and the Jujuy Province mining and energy company, JEMSE (8.5%) with a construction budget of US$229m including contingency. The project is fully funded with up to US$275m of funding available via US$82.8m of equity funding from TTC and Orocobre and US$192m of project finance from Mizuho Corporate Bank. First production is scheduled for the end of the second quarter, 2014.

To view the Photos associated with this release, please visit the following link: http://file.marketwire.com/release/orl529-Photos.pdf.

About Orocobre Limited

Orocobre Limited is listed on the Australian Securities Exchange and Toronto Stock Exchange (TSX:ORL)(ASX:ORE), and is building a substantial Argentinian-based industrial minerals company through the construction and operation of its portfolio of lithium, potash and boron projects and facilities in the Puna region of northern Argentina. The Company is building in partnership with Toyota Tsusho Corporation the first large-scale, "greenfield" brine based lithium project in 20 years at its flagship Salar de Olaroz resource, with projected production of 17,500 tonnes per annum of low-cost battery grade lithium carbonate scheduled to commence in Q2 2014. The Company also wholly-owns Borax Argentina, an important regional borate producer. Orocobre has recently been included in the S&P/ASX 300 Index and was named 2012 Mining Company of the Year by Argentine mining magazine Panorama Minero and the Fundacion para el desarrollo de le Mineria Argentina ("Fundamin" or Foundation for Development of Argentina Mining). For further information, please visit www.orocobre.com.


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ

Orocobre Limited es uno de los productores de productos químicos de litio más grandes y económicos del mundo. La única compañía que cotiza en ASX produce productos químicos de litio de alto valor.

Tiene sede en Brisbane, Australia. El enfoque actual de la compañía está en las operaciones de extracción de litio y bórax en Argentina. Desde 2007, Orocobre Ltd. está registrada en el Australian Securities Exchange ASX y, a partir de 2010, figura en la TSX.

Teléfono/s
- 61 73871 3985 Fax:61 7 3720 8988
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF