PDAC 2026SECCO ENCABEZADOgolden arrow
GLENCORE PACHON dia trabajador mineroMAPAL ENCABEZADO
WICHI TOLEDO ENCABEZADOWEG
VELADERO ENCABEZADO
KNIGHT PIÉSOLD ENCABEZADOSAXUM ENGINEERED SOLUTIONS ENCABEZADO
RIO TINTO LITHIUMWEG PINTURAS ENCABEZADOHIDROCONSTRUCCIONES
Milicic ENCABEZADOGLOBAL MINING ENCABEZADO
LITHIUM SOUTHGSB ROTATIVO MINING
OMBU CONFECATHIDROAR ENCABEZADO
ABRASILVER ENCABEZADORUCAPANELEPIROC ENCABEZADO
INFA ENCABEZADOCERRO VANGUARDIA
TELMECNEWMONT COVIDEXAR ENCABEZADO
INBELTCASUCCIArgentina lithium energy
SACDE ENCABEZADOEMERGENCIAS ENCABEZDODELTA MINING
AGUARTEC ECNABEZADOERAMET CABECERAPAN AMERICAN SILVER
FERMA ENCABEZADOMANSFIELD MINERA H
LUNDIN MINING Q2 2013 RESULTS
30/07/2013

Toronto, Canada

Lundin Mining

July 30, 2013

(TSX: LUN; OMX: LUMI) Lundin Mining Corporation (“Lundin Mining” or the “Company”) today reported net earnings of $16.6 million ($0.03 per share) for the quarter ended June 30, 2013. Cash flows of $26.6 million were generated from operations, not including the Company’s attributable cash flows of $32.4 million from Tenke Fungurume.

Paul Conibear, President and CEO commented, "During the second quarter, our operations continued, overall, to perform well and we remain on track to achieve our 2013 production guidance. Tenke had another record copper production quarter and cash distributions received to date exceeded original expectations.

Due to the on-going weakness in metal prices, the Company has implemented initiatives to reduce or defer capital investments and some exploration spending until metal markets improve. We continue to evaluate our operations with the aim to actively preserve margins and maximize profitability.

The second quarter also marked a milestone of regenerating growth in the Company with the acquisition of the high grade Eagle Mine. The transaction represents a significant achievement in our long-stated objective of acquiring a high quality, advanced stage asset in a low risk, mining oriented jurisdiction. Construction is ramping up well at the Eagle mine and mill site and we look forward to an exciting year ahead as it comes into production in 2014."

Ver Reporte Completo>>>


Vuelva a HOME

*La información y las opiniones aquí publicados no reflejan necesariamente la línea editorial de Mining Press y EnerNews

CONTACTE AQUÍ
Teléfono/s
- 1 416 342 5560 Fax:1 416 348 0303
Rubros
- Mineras

KNIGHT PIESOLD DERECHA NOTA GIF 300
Lo más leído
PODER DE CHINA
NOTA MÁS LEIDAs MP GIF