Anglo American PLC
18 October, 2013
Overview
+ Kumba Iron Ore production decreased by 24% to 9.5 Mt following weaker production at Sishen which was partially offset by a strong performance at Kolomela
+ Export metallurgical coal production increased by 9% to a record 4.9 Mt due to continued longwall performance improvements which more than offset the planned closure at Aquila
+ Export thermal coal production from South Africa decreased by 1% to 4.5 Mt. Cerrejón production increased to 3.2 Mt, a 13% increase, as the operation maintained a strong recovery post the strike in Q1 2013
+ Copper production(1) increased by 32% to 207,300 tonnes, with 22% higher production at Los Bronces and a 130% increase at Collahuasi
+ Nickel production increased by 7% to 9,600 tonnes, with higher production at Barro Alto more than offsetting the permanent cessation of production at Loma de Níquel. Production at Barro Alto increased by 51% to 7,100 tonnes
+ Niobium production increased by 7% to 1,100 tonnes, reflecting operational improvements at the plants and improved grades
+ Phosphates production increased by 5% to 326,300 tonnes due to performance improvements and increased plant availability
+ Platinum equivalent refined production was flat at 623,000 ounces. In line with the restructuring plans, Khomanani, Khuseleka 2 and Union North decline were placed on long term care and maintenance
+ Diamond production increased by 21% to 7.7 million carats, primarily owing to the Jwaneng mine recovering fully from the slope failure in June 2012